New York State Department of Transportation
State AgencyNY
Posted
Nov 4, 2026
Dec 3, 2026
Culvert Rehabilitation RFP
Work include 18 CY unclassified excavation and disposal; 25 CY embankment in place; 670 CY structure excavation; 150 CY trench and culvert excavation; 11,510 SY seed and mulch - temporary; 975 LF sediment filter log - temporary, 12", type a; 915 SY stabilized construction access; 40 CY concrete for structures, performance; 345 LF lining with profile wall high density polyethylene pipe 78inch diameter; 187 CY stockpiling and placing existing stream bed materials.
