Summary
Perform emergency and on-call work on existing MCMUA water distribution infrastructure in the event a leak or other event which sacrifices the MCMUA system integrity or ability to deliver clean and reliable water is observed. This project will improve and streamline the current process and significantly reduce the repair duration. •Due to the emergency and on-call nature of the work, the contractor is encouraged to meet the following qualifications: oThe Contractor as a firm shall have access, through rental or ownership, to the following equipment, (2) excavators, (2) dump trucks, (2) utility trucks, (2) air compressors, (2) trench rollers, (2) asphalt rollers, and (2) portable light tower. oThe Contractor as a firm shall have immediate access or ability to procure the following materials: (10’) 4” Ductile Iron Pipe, (10’) 6” Ductile Iron Pipe, (10’) 8” Ductile Iron Pipe, (10’) 10” Ductile Iron Pipe, (10’) 12” Ductile Iron Pipe, (10’) 14” Ductile Iron Pipe, (10’) 16” Ductile Iron Pipe, (10’) 18” Ductile Iron Pipe, (10’) 20” Ductile Iron Pipe, (10’) 24” Ductile Iron Pipe, (2) 4” Ductile Iron Pipe Hymax Couplings, (2) 6” Ductile Iron Pipe Hymax Couplings, (2) 8” Ductile Iron Pipe Hymax Couplings, (2) 10” Ductile Iron Pipe Hymax Couplings, (2) 12” Ductile Iron Pipe Hymax Couplings, (2) 14” Ductile Iron Pipe Hymax Couplings, (2) 16” Ductile Iron Pipe Hymax Couplings, (2) 18” Ductile Iron Pipe Hymax Couplings, (2) 20” Ductile Iron Pipe Hymax Couplings, and (2) 24” Ductile Iron Pipe Hymax Couplings. oThe Contractor shall have the ability to perform work within 4 hours of notification in any of the municipalities in which MCMUA has water transmission mains and all locations of MCMUA water distribution infrastructure.