Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The National Park Service seeks construction services for improvements to El Calderon Trail and a new trail to meet accessibility standards, including a boardwalk system into Junction Cave, amphitheater development, and parking lot enhancements. The project is a total small business set-aside with a magnitude between $1,000,000 and $5,000,000.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The University of Waterloo is soliciting proposals for a VR Immersive CAVE to support vision-first visuomotor integration research, enabling development of treatments for concussion and assessment of visuomotor deficits caused by amblyopia. The system will be installed and operated in the Canadian Vision Imaging Centre (CVIC) within the Waterloo Eye Institute.
Posted Date
Nov 19, 2025
Due Date
Dec 15, 2025
Release: Nov 19, 2025
Close: Dec 15, 2025
The University of Waterloo is soliciting proposals for a VR Immersive CAVE to support vision-first visuomotor integration research, enabling development of treatments for concussion and assessment of visuomotor deficits caused by amblyopia. The system will be installed and operated in the Canadian Vision Imaging Centre (CVIC) within the Waterloo Eye Institute.
Premium
Access the largest public sector contact database
Construct a new AVGAS fueling system. Major elements of work for the project include but are not limited to the construction of an AVGAS fueling system equipment pad and concrete foundations, asphalt paving improvements, drainage improvements, electrical improvements, and manufacturer, installation, and commissioning of new AVGAS fueling equipment.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
Construct a new AVGAS fueling system. Major elements of work for the project include but are not limited to the construction of an AVGAS fueling system equipment pad and concrete foundations, asphalt paving improvements, drainage improvements, electrical improvements, and manufacturer, installation, and commissioning of new AVGAS fueling equipment.
AvailableWork includes replacing the aged water main and service lines within the Housing and Administrative area above Bat Cave Draw. The work involves installing approx. 1000 FT of 8 HDPE, 30 FT of 6 HDPE, 1650 FT of 4 HDPE watermain, 1010 FT of 2 HDPE, 430 FT of 3/4 HDPE service lines, fittings, installing five 8" gate valves, four 6" gate valves, and nine 4" gate valves, two new fire hydrant assemblies, replacing two existing fire hydrant assemblies, and replacing and burying the service line behind the Bat Flight Draw comfort station. Work includes soil borings, rock trenching, replacing hardscape, revegetation, capping the existing waterlines for abandonment in place after the new line is put into service, and removal of the existing hydrants to be replaced in place.
Posted Date
Nov 7, 2025
Due Date
Jan 7, 2026
Release: Nov 7, 2025
Close: Jan 7, 2026
Work includes replacing the aged water main and service lines within the Housing and Administrative area above Bat Cave Draw. The work involves installing approx. 1000 FT of 8 HDPE, 30 FT of 6 HDPE, 1650 FT of 4 HDPE watermain, 1010 FT of 2 HDPE, 430 FT of 3/4 HDPE service lines, fittings, installing five 8" gate valves, four 6" gate valves, and nine 4" gate valves, two new fire hydrant assemblies, replacing two existing fire hydrant assemblies, and replacing and burying the service line behind the Bat Flight Draw comfort station. Work includes soil borings, rock trenching, replacing hardscape, revegetation, capping the existing waterlines for abandonment in place after the new line is put into service, and removal of the existing hydrants to be replaced in place.
AvailableIn general, the work consists of: Shoreline restoration, trail rehabilitation, new trail construction, floating dock, and incidentals at Governor Nelson State Park. Trail resurfacing at the Glacial Drumlin State Trail. Trail resurfacing at Lake Kegonsa State Park.
Posted Date
Nov 11, 2025
Due Date
Dec 17, 2025
Release: Nov 11, 2025
Close: Dec 17, 2025
In general, the work consists of: Shoreline restoration, trail rehabilitation, new trail construction, floating dock, and incidentals at Governor Nelson State Park. Trail resurfacing at the Glacial Drumlin State Trail. Trail resurfacing at Lake Kegonsa State Park.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis