South Carolina Department of Administration
State AgencySC
Posted
Oct 19, 2026
Nov 24, 2026
Mills/Jarrett Building - Parking Lot Improvements (Design-Bid-Build) RFP
Repair/resurfacing of pavement at the Mills/ Jarrett Building parking lot area.
Description: Design and construction of an approximately 59,300-square-foot asphalt parking lot and driveway, including drainage, at Elk Creek Kiowa Casino in Hobart, Oklahoma.
SpecialDistrict · OK, US
Decision makers connected to this RFP from Kiowa Tribe Housing Authority.
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
South Carolina Department of Administration
State AgencySC
Posted
Oct 19, 2026
Nov 24, 2026
Repair/resurfacing of pavement at the Mills/ Jarrett Building parking lot area.
Posted
Nov 19, 2026
Jan 6, 2027
The site visit will be held on Wednesday, December 2, 2026, at 10:30 a.m. Eastern Standard Time (EST). Quoters who do not attend the mandatory site visit will be non-responsive offerors. USDA requires a Design/Build contractor to complete the rehabilitation of Parking Lot 9 at the Jamie L. Whitten Building in Washington, DC. The project includes perimeter security upgrades, parking lot resurfacing, sinkhole remediation, electrical work, and landscaping, and is a key component of a larger effort to establish Level IV security protection around the facility. The contractor must assess and update incomplete 2021 construction documents, verify the suitability of security materials already stored on site, and coordinate closely with WMATA due to the Orange, Blue, and Silver Metro lines running beneath the parking lot. After construction began in 2024, sinkholes developed near a WMATA elevator, halting work; therefore, the contractor must determine the full extent of subsurface issues and implement a remediation plan approved by both USDA and WMATA, incorporating recommendations from Langans geotechnical investigation. With historic preservation approvals already secured and no work-hour restrictions in place, the projects objective is to restore progress on the halted construction and deliver the required Level IV perimeter security enhancements within eleven and a half months of Notice to Proceed (NTP) issuance.
Special DistrictOK
Posted
Nov 17, 2026
Dec 1, 2026
Professional engineering/design and construction services to redesign and construct approximately 475,000 square feet of asphalt parking, driveway, and drainage at the Kiowa Tribe Devol Casino.
CityUT
Posted
Nov 5, 2026
Dec 8, 2026
Lehi City is seeking a qualified Design-Build Contractor to design and construct a trailhead park in the Traverse Mountain area. The project will provide parking, trail access, visitor amenities, and gathering space while creating an attractive transition between the developed community and the native mountain landscape.