Summary
Project generally consists of the installation of a 500,000 gallon elevated water storage tank; tank mixing system; painting; control valve; exposed and buried ductile iron piping including piping to bypass existing system facilities to be taken out of service; electrical utility service connection equipment; standby generator with buried propane fuel tank; controls including radio communication; cellular alarm panel; lighting; grounding; power and control wiring; site work; paving; e&s control devices; demolition and removal of existing control valve vault and associated piping; paving and surface restoration. See attached file.