Open RFP

Electrical System Operations \& Maintenance Services

Description: The Port invites submittal of proposals from qualified contractors for electrical operations and maintenance services. The Port owns and operates an electric distribution system serving the West Complex on Rough and Ready Island. The Port electrical system includes a 60 kV substation requiring comprehensive testing and maintenance every other year as directed by the Port-designated Engineer of Record; two 25 MW, 60 kV to 12.47 kV power transformers with associated protective breakers and circuit switchers; two 12.47 kV power distribution and control powerhouses; several 12.47 kV overhead and underground distribution circuits; approximately 300 joint-use utility power poles; approximately 100 pad-mounted and pole-mounted distribution transformers; and approximately 80 street lights. The system serves Port facilities and tenant loads, including electrical facilities downstream of certain service points and meters. The Electrical System also includes the Port-maintained wireless Tantalus power metering system with approximately 250 revenue-grade power meters in service. The Contractor shall maintain and support the metering system as further described in Section 5.5 Tantalus Revenue Metering System. The purpose of this Contract is to provide the qualified personnel, equipment, tools, and technical resources necessary to operate, inspect, maintain, test, troubleshoot, repair, and support improvements to the Port Electrical System. The work includes 60 kV substation and 12.47 kV distribution-system maintenance; overhead and underground distribution work; switching and outage response; transformer, switchgear, cable, and protective-device maintenance and testing; Port facility and commercial electrical work; street lighting; revenue metering; emergency response; preventive maintenance; and related electrical construction. The Contractor shall also provide the documentation, testing, coordination, and qualified personnel required to maintain the Electrical System in a safe and reliable operating condition. For purposes of this contract, equipment used in performing the work is classified as either Port-owned equipment or Contractor-owned equipment. No serving-utility equipment is included in the Electrical System covered by this scope. The Port intends to engage in a three (3) year contract with two, 1-year options with the successful Respondent. Mandatory In Person Conference Date Date: 17 de noviembre de 2026 a las 10:00 a.m. PST Port will conduct a MANDATORY, in-person Pre-Proposal Conference and site visit for this solicitation at 10:00 a.m. on November 17, 2026, meeting at the Port Administration Building, 315 Fyffe Avenue, Stockton, California, to consider such matters as Respondents may request. Prospective respondents to this solicitation must attend the Pre-bid Conference and sign an attendance roster as a condition to the bidding.

Buyer
Stockton Port Dist

SpecialDistrict · CA, US

Released
Jun 11, 2026
Closes
Dec 16, 2026(38 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts