Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Maintain reliable sewage conveyance and extend the useful life of the existing interceptor by rehabilitating the pipeline, while minimizing capacity impacts. Project will rehabilitate 4,800 feet of the existing 90-ince diameter, 5,600-foot-long tunnel from the energy dissipating structure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of rehabilitating the sanitary sewer system by performing cure-in-place pipe lining, manhole rehabilitation and restoration as shown on the plans and described in the specifications. This work shall include all labor, materials, supplies, transportation, equipment, and services necessary and required to perform the project. See outside link.
Posted Date
Dec 8, 2025
Due Date
Feb 24, 2026
Release: Dec 8, 2025
Close: Feb 24, 2026
Project consists of rehabilitating the sanitary sewer system by performing cure-in-place pipe lining, manhole rehabilitation and restoration as shown on the plans and described in the specifications. This work shall include all labor, materials, supplies, transportation, equipment, and services necessary and required to perform the project. See outside link.
Premium
Access the largest public sector contact database
DC Water issued a Request for Information (RFI) for the Potomac Interceptor Rehabilitation / Potomac Interceptor Project seeking responses from qualified design and construction firms experienced with large-diameter conveyance rehabilitation and maintenance-of-flow during construction. The project will be performed in the District of Columbia and aims to enhance reliability and efficiency of the wastewater conveyance system. The posting estimates an overall project value range and invites Letters of Interest and responses to support project planning.
Posted Date
Dec 11, 2025
Due Date
Jan 27, 2026
Release: Dec 11, 2025
Close: Jan 27, 2026
DC Water issued a Request for Information (RFI) for the Potomac Interceptor Rehabilitation / Potomac Interceptor Project seeking responses from qualified design and construction firms experienced with large-diameter conveyance rehabilitation and maintenance-of-flow during construction. The project will be performed in the District of Columbia and aims to enhance reliability and efficiency of the wastewater conveyance system. The posting estimates an overall project value range and invites Letters of Interest and responses to support project planning.
AvailableThe proposed project includes the cured-in-place pipe (CIPP) lining rehabilitation of approx. 2,744 LF of 42” sewer pipes along the Lower Mill River Interceptor.
Posted Date
Oct 21, 2025
Due Date
Dec 18, 2025
Release: Oct 21, 2025
Close: Dec 18, 2025
The proposed project includes the cured-in-place pipe (CIPP) lining rehabilitation of approx. 2,744 LF of 42” sewer pipes along the Lower Mill River Interceptor.
AvailableRehabilitation of approximately 11,594 LF of 8" and 850 LF of 10", and 930 LF of 12" existing sanitary sewer using pipe bursting method. Work also includes rehabilitation of lateral connections, point repairs, recoating of existing sanitary manholes, and rehabilitation of existing conditions in a residential community. 14,006 LF CCTV Video inspection for pre and post rehabilitation of sewer lines. 24 EA sewer main point repairs including excavation, bypass pumping, dewatering, bedding material, preparation and replacing irrigation lines. 100 LF 4" sidewalk, 633 LF 8" DI pipe with CIPP.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Close: Dec 16, 2025
Rehabilitation of approximately 11,594 LF of 8" and 850 LF of 10", and 930 LF of 12" existing sanitary sewer using pipe bursting method. Work also includes rehabilitation of lateral connections, point repairs, recoating of existing sanitary manholes, and rehabilitation of existing conditions in a residential community. 14,006 LF CCTV Video inspection for pre and post rehabilitation of sewer lines. 24 EA sewer main point repairs including excavation, bypass pumping, dewatering, bedding material, preparation and replacing irrigation lines. 100 LF 4" sidewalk, 633 LF 8" DI pipe with CIPP.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis