Harris County Mud 167
Rehabilitation of approximately 11,594 LF of 8" and 850 LF of 10", and 930 LF of 12" existing sanitary sewer using pipe bursting method. Work also includes rehabilitation of lateral connections, point repairs, recoating of existing sanitary manholes, and rehabilitation of existing conditions in a residential community. 14,006 LF CCTV Video inspection for pre and post rehabilitation of sewer lines. 24 EA sewer main point repairs including excavation, bypass pumping, dewatering, bedding material, preparation and replacing irrigation lines. 100 LF 4" sidewalk, 633 LF 8" DI pipe with CIPP.
Sanitary Sewer Rehabilitation for Villages of Bear Creek Section 1
zip
City of Golden Valley
Work includes approx 2,450 LF 8"-12" sewer rehabilitation, cipp; 2,700 LF sewer pipe cleaning; 2,700 LF cctv, initial; 2,700 LF of cctv, post. See outside link.
Borough of Millerstown
Project generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
Douglas County Sanitary And Improvement District 484
Approx 1,550 LF Construct 8" sanitary sewer pipe; 103 VF construct 54" I.D. Sanitary manhole (8); 725 LF construct 6" sanitary sewer pipe; 6 VF construct 8" diameter drop connection (1); 14 VF construct 6" sanitary service riser (2); 600 ton construct aggregate bedding for trench stabilization (3" clean); etc.
Release
Nov 14, 2025
Close
Dec 16, 2025