Greater New Haven Regional Water Pollution Control Authority
The proposed project includes the cured-in-place pipe (CIPP) lining rehabilitation of approx. 2,744 LF of 42” sewer pipes along the Lower Mill River Interceptor.
Lower Mill River Interceptor Rehabilitation - Phase 2
zip
Boston Water & Sewer Commission
Project consists of rehabilitation of the new boston main interceptor. See outside link.
Boston Water & Sewer Commission
Rehabilitation of the new boston main interceptor.
City of Raleigh
Seeking one or more qualified professional engineering services for the design of the lower harris creek interceptor. This project will replace and parallel approximately 21,495 linear feet of sanitary sewer with new 30" pipe to increase capacity, reduce the risk of sewer surcharge, and address needed repairs. Services will also include the following:. Expediated preliminary engineering services (ideally less than 6 months); 1. Wetland, stream, and buffer delineation & permitting; 2. Geotechnical evaluation; 3. Subsurface utility exploration; 4. Design and permitting of sewer interceptor; 5. Traffic control plan; 6. Easement plat preparation and recordation; 7. Bid phase services; 8. Select construction administration services and inspection; 9. As-built survey and plans.