Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 EA patch/repair damage to the exterior insulation and finish system (efis) on both buildings. Remove only damaged portions of the efis system in its entirety to concrete masonry unit substrate and patch/repair efis in-kind to match adjacent surfaces to remain; 1 EA inspect and investigate cause of through wall water intrusion at aluminum windows. Repair or replace aluminum windows, as required, to eliminate water intrusion into buildings. Provide and install metal flashing at exterior sills of aluminum windows to slope provide positive slope over the face of the building; 1 EA remove and replace exterior sealant at the perimeter of windows and doors.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 3,363 SY extra high early strength concrete pavement repair, 10"; 1 LS erosion control items for prevention of slurry release; 24,269 SY final textured surface area of diamond ground pavement; 8,966 LF temporary pavement marking-paint 8"; 2,400 hr flagger; 2,213 LF channelizing line, type v, 8 in, white; 1,188 LF stripe, type v, 12 in, white.
Posted Date
Dec 18, 2025
Due Date
Feb 3, 2026
Release: Dec 18, 2025
Close: Feb 3, 2026
Work includes 3,363 SY extra high early strength concrete pavement repair, 10"; 1 LS erosion control items for prevention of slurry release; 24,269 SY final textured surface area of diamond ground pavement; 8,966 LF temporary pavement marking-paint 8"; 2,400 hr flagger; 2,213 LF channelizing line, type v, 8 in, white; 1,188 LF stripe, type v, 12 in, white.
AvailableProvide remediation of documents service.
Posted Date
Jan 23, 2026
Due Date
Feb 6, 2026
Release: Jan 23, 2026
Close: Feb 6, 2026
Provide remediation of documents service.
AvailableProvide mold remediation services.
Posted Date
Jan 22, 2026
Due Date
Feb 17, 2026
Release: Jan 22, 2026
Close: Feb 17, 2026
Provide mold remediation services.
AvailableSeeking a qualified toll collections expert to assist in monitoring and overseeing the commission's toll collections process.
Posted Date
Dec 30, 2025
Due Date
Feb 2, 2026
Release: Dec 30, 2025
Close: Feb 2, 2026
Seeking a qualified toll collections expert to assist in monitoring and overseeing the commission's toll collections process.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis