Summary
Replacement of the existing east shore lift station with a completely new lift station. The work shall include the installation of a wet well and a prefabricated enclosure to house the new piping and valves. The work shall also include all associated mechanical and electrical work, new submersible pumps, connection to the existing force main, extension of and connection to the existing gravity sewer system, the control panel, connection to the village s existing scada system, pump programming, installation of a new emergency generator, painting, abandonment and demolition of the existing station, access drive construction, paving, and associated site restoration. An alternate bid item shall include installation of a prefabricated control building to house the new piping and valves in place of the prefabricated enclosure.