Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project involves full depth pavement reclamation & fine grading, cross culvert installation, the installation of a precast concrete box culvert (supplied by the town), riprap, subbase course gravel, variable depth base course gravel, hot mix asphalt base & surface paving, steel beam guardrails, installing gravel shoulders, and other related incidental items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Full depth reclamation of existing asphalt, Apshalt removal and replacement, HMA patching, storm sewer install, removal and replacement of concrete curb ramps, sidewalk, curb, gutter, valley pans, cross pans at multiple locations.
Posted Date
Jan 16, 2026
Due Date
Feb 13, 2026
Release: Jan 16, 2026
Close: Feb 13, 2026
Full depth reclamation of existing asphalt, Apshalt removal and replacement, HMA patching, storm sewer install, removal and replacement of concrete curb ramps, sidewalk, curb, gutter, valley pans, cross pans at multiple locations.
AvailableProject includes mill bituminous surface, cold in place recycling, full depth reclamation, aggregate base, bituminous overlay and aggregate shoulders.
Posted Date
Jan 21, 2026
Due Date
Feb 17, 2026
Release: Jan 21, 2026
Close: Feb 17, 2026
Project includes mill bituminous surface, cold in place recycling, full depth reclamation, aggregate base, bituminous overlay and aggregate shoulders.
AvailableGrading, Bituminous Surfacing, Stabilized Full Depth Reclamation, Roundabout, ADA Improvements, Signals, Pedestrian Crosswalk Flasher System & Lighting.
Posted Date
Jan 2, 2026
Due Date
Jan 28, 2026
Release: Jan 2, 2026
Close: Jan 28, 2026
Grading, Bituminous Surfacing, Stabilized Full Depth Reclamation, Roundabout, ADA Improvements, Signals, Pedestrian Crosswalk Flasher System & Lighting.
AvailableConstruction of cold plane, full-depth reclamation, placing and compacting hot mix asphalt paving, traffic handling, use of traffic control, portable changeable message signs, sign installation, pavement delineation and striping.
Posted Date
Dec 26, 2025
Due Date
Jan 29, 2026
Release: Dec 26, 2025
Close: Jan 29, 2026
Construction of cold plane, full-depth reclamation, placing and compacting hot mix asphalt paving, traffic handling, use of traffic control, portable changeable message signs, sign installation, pavement delineation and striping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis