Summary
1,930 LF of 8" Ductile Iron Water Main, complete in place, including
testing; 110 LF of 6" Ductile Iron Water Main, complete in place, including testing; 55 LF of 4" Ductile Iron Water Main, complete in
place, including testing; 7 ea of 8" Gate Valve with Valve Box, complete in place, including testing; 3 ea of 6" Gate Valve with
Valve Box, complete in place, including testing; 3 ea 4" Gate Valve with Valve Box, complete in place, including testing; 500 LF of 3/4" Service Pipe, Copper Tubing, complete in place, including testing; 30 ea of 3/4" Service Connection, complete in place, including corporation stop, curb stop, and curb box; 30 ea of 3/4" Coupling,
complete in place; 1 ea of 48" Manhole Demolition, complete in place; 2 ea of 48" Manhole (0-6' Deep), complete in place; 6 VLF 48" Manhole Over 6' Deep, complete in place; 300 LF Sewer Line Abandoned
in Place, filled with Flowable Fill, complete in place; 140 LF of 6" PVC Sewer Pipe, complete in place, including testing; 480 SF Concrete Sidewalk Repair, complete in place; 860 SY PennDOT Paving Restoration, complete in place; 3,600 SY Mill and Overlay, 3,600 SY PennDOT Road, complete in place; 2,500 SY Mill and Overlay,
Borough Road, complete in place.