Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Village of Mackinaw
Work includes approx: 297 FT of 6" water main; 25 FT of water main encasement, and other collateral work. see outside link
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Kansas City
Work includes approx 1,850 LF 10" CIP water main with 1,850 LF 10" DIP water main; 375 LF of 8" DIP water main. See outside link.
Posted Date
Nov 20, 2025
Due Date
Dec 9, 2025
Release: Nov 20, 2025
City of Kansas City
Close: Dec 9, 2025
Work includes approx 1,850 LF 10" CIP water main with 1,850 LF 10" DIP water main; 375 LF of 8" DIP water main. See outside link.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Vancouver
Invitation to Bid (ITB) from the City of Vancouver, Washington for the Phoenix Way & California St. Water Main Replacement, replacing roughly 6,706 linear feet of 4–8" ductile iron water main and associated hydrants, valves, and appurtenances. This is a public works, non-federal solicitation with contractor licensing, UBI, prevailing wage and bonding requirements, an engineer's estimate of $1,860,000, and sealed bids due December 16, 2025.
Posted Date
Nov 20, 2025
Due Date
Dec 16, 2025
Release: Nov 20, 2025
City of Vancouver
Close: Dec 16, 2025
Invitation to Bid (ITB) from the City of Vancouver, Washington for the Phoenix Way & California St. Water Main Replacement, replacing roughly 6,706 linear feet of 4–8" ductile iron water main and associated hydrants, valves, and appurtenances. This is a public works, non-federal solicitation with contractor licensing, UBI, prevailing wage and bonding requirements, an engineer's estimate of $1,860,000, and sealed bids due December 16, 2025.
AvailableCity of Vancouver
Invitation to Bid (ITB) from the City of Vancouver, Washington for the Phoenix Way & California St. Water Main Replacement, replacing roughly 6,706 linear feet of 4–8" ductile iron water main and associated hydrants, valves, and appurtenances. This is a public works, non-federal solicitation with contractor licensing, UBI, prevailing wage and bonding requirements, an engineer's estimate of $1,860,000, and sealed bids due December 16, 2025.
Posted Date
Nov 20, 2025
Due Date
Dec 16, 2025
Release: Nov 20, 2025
City of Vancouver
Close: Dec 16, 2025
Invitation to Bid (ITB) from the City of Vancouver, Washington for the Phoenix Way & California St. Water Main Replacement, replacing roughly 6,706 linear feet of 4–8" ductile iron water main and associated hydrants, valves, and appurtenances. This is a public works, non-federal solicitation with contractor licensing, UBI, prevailing wage and bonding requirements, an engineer's estimate of $1,860,000, and sealed bids due December 16, 2025.
AvailableCity of Bloomington
This project shall include, but is not limited to, the construction of curb ramps, curbs and sidewalks at five intersections along east 2nd St. The installation of a new storm inlet, and pipe is included in this project.
Posted Date
Nov 2, 2025
Due Date
Dec 1, 2025
Release: Nov 2, 2025
City of Bloomington
Close: Dec 1, 2025
This project shall include, but is not limited to, the construction of curb ramps, curbs and sidewalks at five intersections along east 2nd St. The installation of a new storm inlet, and pipe is included in this project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →