Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of a two new 120,000 gallon bolted steel water tanks at two separate tank sites. Also includes a small retaining wall, an enclosed pump station, and storm water drainage.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The work consists of approx. The construction of a 500,000-gallon welded-steel water storage tank involving all civil, mechanical, electrical for system operation as indicated by the contract documents. 1 LS mobilization; 1 LS site clearing, grubbing, and rough excavation; 1 LS form and pour concrete tank foundation; 1 LS furnish and construct new 500,000 gallon welded steel water tank; 1 LS furnish and install piping and appurtenances for tank inlet; 1 LS furnish and install piping and appurtenances for tank distribution line and connection to pump station; 1 LS furnish and install piping and appurtenances for tank drain and overflow lines; 1 LS furnish and install pressure transducer access manhole; 1 LS installation of electrical, communication, and control systems. See attached file.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Premium
Access the largest public sector contact database
Close: Dec 18, 2025
The work consists of approx. The construction of a 500,000-gallon welded-steel water storage tank involving all civil, mechanical, electrical for system operation as indicated by the contract documents. 1 LS mobilization; 1 LS site clearing, grubbing, and rough excavation; 1 LS form and pour concrete tank foundation; 1 LS furnish and construct new 500,000 gallon welded steel water tank; 1 LS furnish and install piping and appurtenances for tank inlet; 1 LS furnish and install piping and appurtenances for tank distribution line and connection to pump station; 1 LS furnish and install piping and appurtenances for tank drain and overflow lines; 1 LS furnish and install pressure transducer access manhole; 1 LS installation of electrical, communication, and control systems. See attached file.
AvailableConstruction of a 500,000-gallon welded-steel water storage tank (including all civil, mechanical, and electrical work) in Park City, UT; single-prime contract with lump-sum and unit-price bidding (additive alternates), 5% bid bond required, and bidders must hold proper licensing.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Construction of a 500,000-gallon welded-steel water storage tank (including all civil, mechanical, and electrical work) in Park City, UT; single-prime contract with lump-sum and unit-price bidding (additive alternates), 5% bid bond required, and bidders must hold proper licensing.
AvailableContract 1, Elevated Water Storage Tank involves replacing the existing water storage tank that serves the western end of Elkin, the eastern part of Wilkes County, and the Town of Ronda with a 500,000-gallon elevated spheroidal water storage tank and appurtenances.
Posted Date
Nov 25, 2025
Due Date
Jan 15, 2026
Release: Nov 25, 2025
Close: Jan 15, 2026
Contract 1, Elevated Water Storage Tank involves replacing the existing water storage tank that serves the western end of Elkin, the eastern part of Wilkes County, and the Town of Ronda with a 500,000-gallon elevated spheroidal water storage tank and appurtenances.
AvailableWork includes replacing the current 1.5 mg standpipe welded steel water storage tank.
Posted Date
Nov 26, 2025
Due Date
Jan 6, 2026
Release: Nov 26, 2025
Close: Jan 6, 2026
Work includes replacing the current 1.5 mg standpipe welded steel water storage tank.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis