Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Wastewater treatment plant improvements. Work includes headworks facility rehabilitation with new screening, grit removal system; influent lift station pump replacement; modify/rehabilitate/expand existing splitter box; construct (1) new primary clarifier; rehabilitate (4) existing SBR cells; construct (1) new SBR cell; rehabilitate/replace existing effluent filter; rehabilitate/modify existing ultraviolet disinfection system; construct new post aeration basin; construct new scum lift station; remove and replace gravity belt thickener; install additional gravity belt thickener; construct new blower building; remove and replace existing blowers; associated piping, valving, flow measurement and misc equipment with appurtenances; associated SCADA & electrical system with appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes waste water treatment plant improvements.
Posted Date
Nov 24, 2025
Due Date
Jan 27, 2026
Release: Nov 24, 2025
Close: Jan 27, 2026
Work includes waste water treatment plant improvements.
AvailableThe project is divided into three separate contracts for the Wastewater Treatment Plant Improvement Project: Contract No. 1A – General Construction; Contract No. 1B – Electrical Construction; and Contract No. 1C - Mechanical Construction.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
The project is divided into three separate contracts for the Wastewater Treatment Plant Improvement Project: Contract No. 1A – General Construction; Contract No. 1B – Electrical Construction; and Contract No. 1C - Mechanical Construction.
AvailableConstruction of a new centralized wastewater treatment plant including new headworks, grit removal, process building, secondary treatment process and associated concrete basins, aeration system, blowers, onsite lift stations, tertiary filtration for metals removal, UV disinfection system, dewatering equipment, chemical feed equipment, silo, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal. Also included is a new lift station at the Henderson WWTP and force main from the Henderson to Veteran's WWTP site for consolidation of all wastewater treatment at the Veteran’s site. Also included are several collection system improvement components throughout the city's collection system. Finally, an office and laboratory building is included.
Posted Date
Dec 5, 2025
Due Date
Feb 19, 2026
Release: Dec 5, 2025
Close: Feb 19, 2026
Construction of a new centralized wastewater treatment plant including new headworks, grit removal, process building, secondary treatment process and associated concrete basins, aeration system, blowers, onsite lift stations, tertiary filtration for metals removal, UV disinfection system, dewatering equipment, chemical feed equipment, silo, and all necessary ancillary piping, electrical, controls, earthwork, and biosolids removal and disposal. Also included is a new lift station at the Henderson WWTP and force main from the Henderson to Veteran's WWTP site for consolidation of all wastewater treatment at the Veteran’s site. Also included are several collection system improvement components throughout the city's collection system. Finally, an office and laboratory building is included.
This RFP is for the procurement of sewer system improvements, specifically for the construction of a New Wastewater Treatment Plant.
Posted Date
-
Due Date
Jan 23, 2026
Close: Jan 23, 2026
This RFP is for the procurement of sewer system improvements, specifically for the construction of a New Wastewater Treatment Plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis