FederalVA
Posted
Nov 2, 2026
Nov 16, 2026
Drydock: USCGC William Chadwick DD FY2027 RFP
Perform drydock repairs to the U.S. Coast guard cutter (USCGC) William Chadwick (WPC-1150). Hull plating, inspect, tanks and voids, inspect and preserve, atertight closures, assess, louver and damper assembly, inspect and repair, ropulsion shafting system, inspect and repair, asw/firemain system components, renew/overhaul, electrical power distribution system, thermographic inspection the period of performance is anticipated to be 119 calendar days with a start date of 8 june 2027 see outside link.
