Summary
Improvements, including but not limited to: Installation of approx. 8,200 LF of storm sewer pipe ranging in size from 8" to 42" diameter, consisting of smooth-lined corrugated polyethylene pipe and reinforced
concrete pipe. Construction of approx. 90 drainage structures, ranging in size from 24" to 120" dia., including large-diameter and outlet control structures. Construction of underground stormwater detention facilities, including underground storage chambers, excavation of approx. 12,000 CY of earth, handling and hauling of spoils, placement of approx. 7,400 CY of aggregate backfill, and site restoration
at multiple locations. Construction of an outlet to an open channel drain, including a rock chute and grade control structure. Clearing and grubbing of drain right-of-way; bulkheading of existing drains and storm sewers; connections to existing drainage systems; utility coordination and adjustments; erosion and sedimentation control; grading; pavement removal and replacement; curb and gutter;
sidewalk; driveway restoration; pavement markings; lawn restoration; and drain right-of-way restoration. Division 2 consists of incidental municipal watermain work along Pleasant Street and associated
improvements, including but not limited to. Abandonment of existing watermain, installation of approx. 470 LF of new 8" watermain, water services, associated drainage improvements, pavement restoration,
and appurtenances.