CityCA
Posted
Nov 9, 2026
Nov 30, 2026
Uncontrolled Crosswalks Improvements on Tweedy Boulevard at Various Locations
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Specifications and Contract Documents. The general items of work include reconstruction of ADA curb ramps, rectangular rapid flashing beacons, signing and striping, relocation of streetlights, removal of tree, construction of sidewalk and all other items that are required by the Contract Documents. The general location of the work is at various locations throughout the City of South Gate along Tweedy Boulevard. See project plans.
