Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Tri-Dam Power Authority
The Tri-Dam Project seeks a qualified solar contractor to plan and install a solar panel array with a propane Generac-brand generator backup to replace the existing power system at Donnells Dam. Work includes decommissioning existing equipment, installation and commissioning of electrical and propane plumbing systems, and delivery of drawings and documentation; the project is expected to begin Jan–Feb 2026 (weather-permitting).
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Hilo Medical Center
Work consists of generator replacement project. Provide a full replacement and upgrade the existing primary power distribution (main switchboard). Scope includes decommissioning of the existing emergency generator, selective demolition of unused conductors and conduit, fuel pumps, exhaust pipes, disposal of oil, fuel and any other chemicals.
Posted Date
Aug 22, 2025
Due Date
Jan 9, 2026
Release: Aug 22, 2025
Hilo Medical Center
Close: Jan 9, 2026
Work consists of generator replacement project. Provide a full replacement and upgrade the existing primary power distribution (main switchboard). Scope includes decommissioning of the existing emergency generator, selective demolition of unused conductors and conduit, fuel pumps, exhaust pipes, disposal of oil, fuel and any other chemicals.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Oregon State Office
Turbine replacement and generator. The scope includes everything necessary to design, test, manufacture and install up to 16 new turbine runners, as well as the refurbishment and/or replacement of other ancillary turbine components to include up to 16 generator rewinds. The brand name items listed are those for which USACE is not able accept equal or alternate items.
Posted Date
Nov 26, 2025
Due Date
Nov 28, 2025
Release: Nov 26, 2025
Oregon State Office
Close: Nov 28, 2025
Turbine replacement and generator. The scope includes everything necessary to design, test, manufacture and install up to 16 new turbine runners, as well as the refurbishment and/or replacement of other ancillary turbine components to include up to 16 generator rewinds. The brand name items listed are those for which USACE is not able accept equal or alternate items.
AvailableU.S. Army Engineer District Portland
Replace turbines. The scope includes everything necessary to design, test, manufacture and install up to 16 new turbine runners, as well as the refurbishment and/or replacement of other ancillary turbine components to include up to 16 generator rewinds.
Posted Date
Nov 12, 2025
Due Date
Nov 28, 2025
Release: Nov 12, 2025
U.S. Army Engineer District Portland
Close: Nov 28, 2025
Replace turbines. The scope includes everything necessary to design, test, manufacture and install up to 16 new turbine runners, as well as the refurbishment and/or replacement of other ancillary turbine components to include up to 16 generator rewinds.
AvailableCity of Redding
Project includes the installation of a new standby generator with associated infrastructure at the burney library. In addition, a portion of the library roof will be replaced with a composite shingle material, and a photovoltaic system will be installed.
Posted Date
Nov 3, 2025
Due Date
Dec 4, 2025
Release: Nov 3, 2025
City of Redding
Close: Dec 4, 2025
Project includes the installation of a new standby generator with associated infrastructure at the burney library. In addition, a portion of the library roof will be replaced with a composite shingle material, and a photovoltaic system will be installed.