Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Enhance the parking lot located to the north of the Ferry Dock, covering 11,000 SY by upgrading the asphalt, lighting and striping. Construct a new sewer lift station with a capacity of approx. 1,050 gpm at the site, including wet well, valve vault, meter vault, electrical equipment, new standby generator and retaining wall. Also demolish the existing wet pit dry pit lift station includes 100 LF sanitary sewer PVC gravity 8" diam. incl bedding, 65 LF sanitary sewer DI force main 8" diam. incl. bedding, 40 LF DI storm sewer pipe 6" diam. incl bedding, 140 LF CPEP storm sewer pipe 12" diam. incl. bedding, 35 LF 1" water service pipe, 200 LF side sewer pipe 6" diam., 500 LF conduit pipe PVC Sch. 40 1" diam. w/fittings, 500 LF #6 AWG x HHW - 2 conductor for street lighting.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project consists of the removal and replacement of the existing mechanical screen and associated electrical and mechanical appurtenances at the city's main sewage lift station.
Posted Date
Dec 10, 2025
Due Date
Dec 19, 2025
Release: Dec 10, 2025
Close: Dec 19, 2025
The project consists of the removal and replacement of the existing mechanical screen and associated electrical and mechanical appurtenances at the city's main sewage lift station.
AvailableProvide bus garage - parking lot - gas station that also includes electrical, earthwork, concrete, landscaping, asphalt, gas fueling station, fencing.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
Close: Dec 17, 2025
Provide bus garage - parking lot - gas station that also includes electrical, earthwork, concrete, landscaping, asphalt, gas fueling station, fencing.
AvailableThe City of Sunrise is soliciting a design-build firm to provide final design, permitting, and construction services for Lift Station Basin 122 Improvement (including Lift Stations 119, 120, 122 and 156). This Step 2 RFP is limited to firms that were pre-qualified in Step 1 (City approval of qualified firms completed Sept 15, 2025). The procurement is for construction/design-build services (not a grant) and is being distributed by DemandStar with addenda posted as needed.
Posted Date
Oct 20, 2025
Due Date
Jan 8, 2026
Release: Oct 20, 2025
Close: Jan 8, 2026
The City of Sunrise is soliciting a design-build firm to provide final design, permitting, and construction services for Lift Station Basin 122 Improvement (including Lift Stations 119, 120, 122 and 156). This Step 2 RFP is limited to firms that were pre-qualified in Step 1 (City approval of qualified firms completed Sept 15, 2025). The procurement is for construction/design-build services (not a grant) and is being distributed by DemandStar with addenda posted as needed.
Work includes installation of a new lift station and demolition/abandonment of the existing lift station. Maintaining operations of all systems during construction. Installation of new gravity system and other work.
Posted Date
Nov 7, 2025
Due Date
Jan 7, 2026
Release: Nov 7, 2025
Close: Jan 7, 2026
Work includes installation of a new lift station and demolition/abandonment of the existing lift station. Maintaining operations of all systems during construction. Installation of new gravity system and other work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis