Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Iowa Department of Administrative Services (DAS) is soliciting professional design services to replace four single-walled diesel tanks with two 25,000-gallon double-walled tanks and provide proper spill containment at the Mt. Pleasant Correctional Facility. Work includes preparation of construction drawings and specifications, routing/reconnection drawings, field examination, material recommendations, survey work, coordination with state agencies, and construction administration. The project schedule targets contract execution in late January 2026 with construction occurring May–September 2026 and closeout in October–November 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The State of Iowa seeks professional design services to replace four existing single‑walled diesel tanks with two 25,000‑gallon double‑walled tanks and provide appropriate exterior spill containment at the Mt. Pleasant Correctional Facility. Scope includes full design disciplines, construction drawings and specifications (including routing/reconnection to existing fuel lines), survey work, code compliance, construction cost opinions, construction administration (RFIs, submittals, change orders, periodic site visits — minimum eight site visits), field observation reports with photos, coordination with utilities and AHJs, and bid assistance. Contract will be a modified ConsensusDoc 803; fee requested as a lump sum with detailed schedule-of-values and unit price per additional inspection visit.
Posted Date
Dec 9, 2025
Due Date
Jan 19, 2026
Release: Dec 9, 2025
Close: Jan 19, 2026
The State of Iowa seeks professional design services to replace four existing single‑walled diesel tanks with two 25,000‑gallon double‑walled tanks and provide appropriate exterior spill containment at the Mt. Pleasant Correctional Facility. Scope includes full design disciplines, construction drawings and specifications (including routing/reconnection to existing fuel lines), survey work, code compliance, construction cost opinions, construction administration (RFIs, submittals, change orders, periodic site visits — minimum eight site visits), field observation reports with photos, coordination with utilities and AHJs, and bid assistance. Contract will be a modified ConsensusDoc 803; fee requested as a lump sum with detailed schedule-of-values and unit price per additional inspection visit.
AvailableProvide spill containment unit, NSN 4235-016688399; Part Number BCI-ATB-20K-KIT, Estimated Requirement MIN 8 MAX 29.
Posted Date
Dec 11, 2025
Due Date
Dec 15, 2025
Release: Dec 11, 2025
Close: Dec 15, 2025
Provide spill containment unit, NSN 4235-016688399; Part Number BCI-ATB-20K-KIT, Estimated Requirement MIN 8 MAX 29.
AvailableDiesel Particulate Filter (DPF) & Diesel Oxidation Catalyst Cleaning Services (DOC).
Posted Date
Nov 24, 2025
Due Date
Dec 19, 2025
Release: Nov 24, 2025
Close: Dec 19, 2025
Diesel Particulate Filter (DPF) & Diesel Oxidation Catalyst Cleaning Services (DOC).
AvailableFurnish all labor, equipment and materials necessary to replace two (2) existing sulfuric acid bulk storage tanks and two (2) day tanks including level transmitters and probes for each tank associated with the nanofiltration (NF) treatment process at the Town’s Water Treatment Plant. Work includes, but is not limited to, replacement of: tanks; fill, transport, overflow and vent piping; electrical panels, conduits, and wires/cables; compressed air piping for the bulk acid storage tanks; and installation of new desiccant air dry systems for both the NF bulk acid storage tanks and the reverse osmosis (RO) treatment acid tanks; as well as all related components and appurtenances required for maintenance of water treatment plant operations and to provide a complete and operational system.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Furnish all labor, equipment and materials necessary to replace two (2) existing sulfuric acid bulk storage tanks and two (2) day tanks including level transmitters and probes for each tank associated with the nanofiltration (NF) treatment process at the Town’s Water Treatment Plant. Work includes, but is not limited to, replacement of: tanks; fill, transport, overflow and vent piping; electrical panels, conduits, and wires/cables; compressed air piping for the bulk acid storage tanks; and installation of new desiccant air dry systems for both the NF bulk acid storage tanks and the reverse osmosis (RO) treatment acid tanks; as well as all related components and appurtenances required for maintenance of water treatment plant operations and to provide a complete and operational system.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis