Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for the repair and replacement of the underground tunnel system, including parking lot, tunnel cap, utility lines, and sump pump system, at Clarinda Correctional Facility.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of the parking lot & tunnel cap, implementation of a sump pump system, replacement of utility lines, repairing the structural integrity of the tunnel walls, and relocation of tunnel access hatches for the Main Building to the SW Wing underground tunnel at the Clarinda Correctional Facility.
Posted Date
Jan 12, 2026
Due Date
Feb 10, 2026
Release: Jan 12, 2026
Close: Feb 10, 2026
Replacement of the parking lot & tunnel cap, implementation of a sump pump system, replacement of utility lines, repairing the structural integrity of the tunnel walls, and relocation of tunnel access hatches for the Main Building to the SW Wing underground tunnel at the Clarinda Correctional Facility.
AvailableWork includes replacement of the parking lot & tunnel cap, implementation of a sump pump system, replacement of utility lines, repairing the structural integrity of the tunnel walls and relocation of tunnel access hatches. See attached file.
Posted Date
Oct 16, 2025
Due Date
Feb 10, 2026
Release: Oct 16, 2025
Close: Feb 10, 2026
Work includes replacement of the parking lot & tunnel cap, implementation of a sump pump system, replacement of utility lines, repairing the structural integrity of the tunnel walls and relocation of tunnel access hatches. See attached file.
AvailableProject includes the rehabilitation of approximately 600 LF of 6×6 steam tunnel from the Bate Building Mechanical room to the Wright steam tunnel connection and minimal site restoration.
Posted Date
Jan 19, 2026
Due Date
Jan 27, 2026
Release: Jan 19, 2026
Close: Jan 27, 2026
Project includes the rehabilitation of approximately 600 LF of 6×6 steam tunnel from the Bate Building Mechanical room to the Wright steam tunnel connection and minimal site restoration.
AvailableWork consists of lining approx. 1,220 LF of a former railroad tunnel with a flanged corrugated metal liner with footings, annular grout backfill, drainage utilities, bulkheads, and interior tunnel trail restoration. Additional tunnel exterior work will consist of the restoration of approximately 8,100 linear feet of bike trail with associated clearing and grubbing, grading, resurfacing, drainage improvements, and pavilion construction.
Posted Date
Jan 7, 2026
Due Date
Feb 11, 2026
Release: Jan 7, 2026
Close: Feb 11, 2026
Work consists of lining approx. 1,220 LF of a former railroad tunnel with a flanged corrugated metal liner with footings, annular grout backfill, drainage utilities, bulkheads, and interior tunnel trail restoration. Additional tunnel exterior work will consist of the restoration of approximately 8,100 linear feet of bike trail with associated clearing and grubbing, grading, resurfacing, drainage improvements, and pavilion construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis