Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Minnesota Department of Natural Resources (DNR) is soliciting contractors for rock stabilization work along the Root River State Trail. The solicitation is an RFx procurement (not a grant) requiring vendor responses via Minnesotas procurement systems. Bids are scheduled to close at the end date listed below and vendors should register on the state's supplier/Bonfire portals to access full solicitation documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes stream stabilization along the river to include but not limited to: grading, excavation, and select structure placement to stabilize the eroding stream bank. Structures to be utilized include rock cross vanes, constructed stone riffles, and live stakes. Stream banks and riparian will be planted with native trees, shrubs, and grasses.
Posted Date
Nov 18, 2025
Due Date
Jan 20, 2026
Release: Nov 18, 2025
Close: Jan 20, 2026
The project includes stream stabilization along the river to include but not limited to: grading, excavation, and select structure placement to stabilize the eroding stream bank. Structures to be utilized include rock cross vanes, constructed stone riffles, and live stakes. Stream banks and riparian will be planted with native trees, shrubs, and grasses.
AvailableThe project includes restoration of stone masonry wingwalls, stabilization of embankment erosion along Rock Run, and replacement of an existing timber pedestrian bridge deck.
Posted Date
Dec 31, 2025
Due Date
Feb 17, 2026
Release: Dec 31, 2025
Close: Feb 17, 2026
The project includes restoration of stone masonry wingwalls, stabilization of embankment erosion along Rock Run, and replacement of an existing timber pedestrian bridge deck.
AvailableThe Town of Port Deposit, Maryland is soliciting bids for the restoration of stone masonry wingwalls, stabilization of embankment erosion along Rock Run, and replacement of an existing timber pedestrian bridge deck.
Posted Date
Dec 31, 2025
Due Date
Feb 17, 2026
Release: Dec 31, 2025
Close: Feb 17, 2026
The Town of Port Deposit, Maryland is soliciting bids for the restoration of stone masonry wingwalls, stabilization of embankment erosion along Rock Run, and replacement of an existing timber pedestrian bridge deck.
AvailableProcurement of a qualified contractor to perform restoration of stone masonry wingwalls and embankment erosion along Rock Run.
Posted Date
Dec 1, 2025
Due Date
Feb 17, 2026
Release: Dec 1, 2025
Close: Feb 17, 2026
Procurement of a qualified contractor to perform restoration of stone masonry wingwalls and embankment erosion along Rock Run.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →