2026 Concrete Road Program RFP
The project includes approx. 885 sq. yds. of ODOT Item 255: Full Depth Pavement Removal and Rigid Replacement, 2 catch basin adjusted to grade and various other items.
Description: Place of base course material and recycled asphalt on 2.36 miles of county-maintained roads throughout county. Commercial base course shall be placed on 1.76 miles of road, and recycled asphalt shall be placed on 0.6 miles of road.
County · SC, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Dillon County.
Adjacent opportunities open for bidding right now.
CityOH
Posted
Sep 17, 2026
Oct 2, 2026
The project includes approx. 885 sq. yds. of ODOT Item 255: Full Depth Pavement Removal and Rigid Replacement, 2 catch basin adjusted to grade and various other items.
CityPA
Posted
Sep 6, 2026
Sep 29, 2026
Work includes approx 26,898 SY 1.5" roadway milling; 685 LF of 24" thermoplastic pavement markings; 44 EA manhole rim adjustments.
CityNJ
Posted
-
Oct 6, 2026
The Borough of Metuchen is soliciting bids for its 2026 Road Program, covering replacement of curbs, sidewalks, driveways, ADA-compliant ramps, roadway base repairs, and milling, paving, and striping throughout the borough. Bidders must submit a bid bond of at least 10% capped at $20,000 and, if awarded, provide performance and payment bonds. The work is to be completed within 90 calendar days after issuance of a Notice to Proceed, with bids closing October 6, 2026.
CityPA
Posted
Sep 17, 2026
Oct 6, 2026
Project involves mill-and-overlay resurfacing on five roadway segments. Scope of work includes milling the existing pavement to a depth of two inches across the full roadway width gutter to gutter, performing base repairs where directed, adjusting existing manholes, inlets, and utilities, repairing asphalt wedge curb as needed, and placing a two-inch Superpave asphalt wearing course from curb to curb. The contractor is also responsible for maintenance and protection of traffic throughout the project, restoration of any disturbed lawn or grass areas, and replacement of pavement markings removed or disturbed during construction.