Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Mobilization; construction surveying; 1 acr, supplementary clearing & grubbing; grading; 100 cy, undercut excavation; 50 cy, select granular material; 100 sy, geotextile for soil stabilization; 4 ton, foundation conditioning material, minor structures; 5 sy, foundation conditioning geotextile; 8 lf, 18" rc pipe culverts, class iii; 6 lf, 15" rc pipe culverts, class iv. See attached file for full scope.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Removal and replacement of existing concrete including concrete pavement, cross-pan, sidewalk, curb and gutter, curb ramps.
Posted Date
Nov 21, 2025
Due Date
Jan 13, 2026
Release: Nov 21, 2025
Close: Jan 13, 2026
Removal and replacement of existing concrete including concrete pavement, cross-pan, sidewalk, curb and gutter, curb ramps.
AvailableLump sum ls mobilization; lump sum ls construction surveying; lump sum ls grading; 1 acr supplementary clearing & grubbing; 900 cy undercut excavation; 30 cy drainage ditch excavation; 10 hr proof rolling; 800 cy select granular material; 800 sy geotextile for soil stabilization; 700 sy rock plating; 50 ton generic grading item; hauling and disposal of petroleum contaminated soil; 780 ton foundation conditioning material, minor structures; 2,440 sy foundation conditioning geotextile; 20 lf 12" drainage pipe;
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Lump sum ls mobilization; lump sum ls construction surveying; lump sum ls grading; 1 acr supplementary clearing & grubbing; 900 cy undercut excavation; 30 cy drainage ditch excavation; 10 hr proof rolling; 800 cy select granular material; 800 sy geotextile for soil stabilization; 700 sy rock plating; 50 ton generic grading item; hauling and disposal of petroleum contaminated soil; 780 ton foundation conditioning material, minor structures; 2,440 sy foundation conditioning geotextile; 20 lf 12" drainage pipe;
Work includes removals, grading, aggregate, concrete pavement, asphalt pavement, curb and gutter, concrete sidewalk, storm sewer, erosion control, permanent signing, traffic control, pavement marking, sanitary, water, restoration.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
Work includes removals, grading, aggregate, concrete pavement, asphalt pavement, curb and gutter, concrete sidewalk, storm sewer, erosion control, permanent signing, traffic control, pavement marking, sanitary, water, restoration.
Available2026 curb, gutter, sidewalk replacement and 2026 citywide accessible pedestrian ramp. Remove and replace existing damaged concrete sidewalks, driveways, curb and gutter, valley gutter, and wheelchair accessible curb ramps; remove roots; root prune trees; and install root barriers at various locations.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
2026 curb, gutter, sidewalk replacement and 2026 citywide accessible pedestrian ramp. Remove and replace existing damaged concrete sidewalks, driveways, curb and gutter, valley gutter, and wheelchair accessible curb ramps; remove roots; root prune trees; and install root barriers at various locations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis