Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Cs1603-24 detroit marinas excavation and resiliency.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking a contractor to provide all materials and labor to the colt railroad resiliency and connectivity project.
Posted Date
Dec 24, 2025
Due Date
Jan 23, 2026
Release: Dec 24, 2025
Close: Jan 23, 2026
Seeking a contractor to provide all materials and labor to the colt railroad resiliency and connectivity project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The County of Sacramento (Sacramento County Department of Transportation) issued an RFP to develop a Wilton Area Resilience Improvement Plan and prepare 30% preliminary design plans and cost estimates to improve roadway resiliency to flooding and wildfires along the Cosumnes River. The consultant will perform project management, public outreach, preliminary design (30% conceptual plans), and cost estimating; the work coordinates with Caltrans and other stakeholders and evaluates multi-modal options. The contract performance period is 18 months from execution.
Posted Date
Jan 16, 2026
Due Date
Feb 19, 2026
Release: Jan 16, 2026
Close: Feb 19, 2026
The County of Sacramento (Sacramento County Department of Transportation) issued an RFP to develop a Wilton Area Resilience Improvement Plan and prepare 30% preliminary design plans and cost estimates to improve roadway resiliency to flooding and wildfires along the Cosumnes River. The consultant will perform project management, public outreach, preliminary design (30% conceptual plans), and cost estimating; the work coordinates with Caltrans and other stakeholders and evaluates multi-modal options. The contract performance period is 18 months from execution.
AvailableConstruction of a new chlorine contact basin, and structural upgrades of the existing finished water reservoir. Construction requires the removal of solids recovery basin (srb) #3 and relocation of piping and electrical for the solids recovery pump station. The remaining work consists of a new ramp into the concrete-lined basin, a roadway along the west and south side of the srbs, replacement of HVAC equipment, and new generators at the operations annex and south coast booster pump station. Work also includes installation of piping and other appurtenances to complete the work, and the repair and reconstruction of existing improvements affected by the work, and incidentals for complete and usable facility.
Posted Date
Nov 6, 2025
Due Date
Jan 29, 2026
Release: Nov 6, 2025
Close: Jan 29, 2026
Construction of a new chlorine contact basin, and structural upgrades of the existing finished water reservoir. Construction requires the removal of solids recovery basin (srb) #3 and relocation of piping and electrical for the solids recovery pump station. The remaining work consists of a new ramp into the concrete-lined basin, a roadway along the west and south side of the srbs, replacement of HVAC equipment, and new generators at the operations annex and south coast booster pump station. Work also includes installation of piping and other appurtenances to complete the work, and the repair and reconstruction of existing improvements affected by the work, and incidentals for complete and usable facility.
AvailableProject consists, in general, of: Replacement of existing stormdrain pipe with larger capacity pipes ranging from 24" to 48" diameter; installation of approx. 3,700 LF of new stormdrain pipe ranging from 36" to 42" diameter; new storm drain manholes and junction boxes; new stormdrain outfall headwalls and wingwalls, tide gates, and rock slope protection; grading of new and existing tidal channels; relocation of 6" to 10" diameter gravity sewer lines and associated manholes; raising and lowering sections of water and sewer laterals and lines; procurement and installation of stormwater trash capture devices and a hydrodynamic separator; removal, stockpiling and disposal excavated material; excavation and placement of marsh soils on low-lying marsh lands and hydroseeding.
Posted Date
Dec 15, 2025
Due Date
Jan 29, 2026
Release: Dec 15, 2025
Close: Jan 29, 2026
Project consists, in general, of: Replacement of existing stormdrain pipe with larger capacity pipes ranging from 24" to 48" diameter; installation of approx. 3,700 LF of new stormdrain pipe ranging from 36" to 42" diameter; new storm drain manholes and junction boxes; new stormdrain outfall headwalls and wingwalls, tide gates, and rock slope protection; grading of new and existing tidal channels; relocation of 6" to 10" diameter gravity sewer lines and associated manholes; raising and lowering sections of water and sewer laterals and lines; procurement and installation of stormwater trash capture devices and a hydrodynamic separator; removal, stockpiling and disposal excavated material; excavation and placement of marsh soils on low-lying marsh lands and hydroseeding.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.