Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide design services for the waterline replacement project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project includes approx. 5,000 LF of waterline replacement to 8 PVC waterline service connections to the new 8 waterline will extend from the existing meter pits. Valves will be analyzed to allow for phasing of switch-over from the existing waterline to the waterline replacement.
Posted Date
Dec 1, 2025
Due Date
Jan 6, 2026
Release: Dec 1, 2025
Close: Jan 6, 2026
Project includes approx. 5,000 LF of waterline replacement to 8 PVC waterline service connections to the new 8 waterline will extend from the existing meter pits. Valves will be analyzed to allow for phasing of switch-over from the existing waterline to the waterline replacement.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construction services, including, but not limited to complete waterline, service line, and meter box replacement for the manor apartments.
Posted Date
Dec 9, 2025
Due Date
Jan 9, 2026
Release: Dec 9, 2025
Close: Jan 9, 2026
Provide construction services, including, but not limited to complete waterline, service line, and meter box replacement for the manor apartments.
AvailableThe City of Grand Prairie is seeking a professional engineering and design firm for a new 16-inch and 24-inch parallel water line system along Goodland Parkway. The firm will handle concept plans, right-of-way documents, construction plan preparation, and construction phase services. Experience with similar waterline projects and close collaboration with City staff are required.
Posted Date
Nov 20, 2025
Due Date
Jan 5, 2026
Release: Nov 20, 2025
Close: Jan 5, 2026
The City of Grand Prairie is seeking a professional engineering and design firm for a new 16-inch and 24-inch parallel water line system along Goodland Parkway. The firm will handle concept plans, right-of-way documents, construction plan preparation, and construction phase services. Experience with similar waterline projects and close collaboration with City staff are required.
AvailableProcurement for complete waterline, service line, and meter box replacement at Manor Apartments, including temporary water service and site restoration.
Posted Date
Dec 9, 2025
Due Date
Jan 9, 2026
Release: Dec 9, 2025
Close: Jan 9, 2026
Procurement for complete waterline, service line, and meter box replacement at Manor Apartments, including temporary water service and site restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →