Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design- Build: Provide design and construction of a new bridge approx 1,441' long, 55' wide offset 40' west of the existing alignment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Change 844 bridge ties on the dual track calumet river truss bridge.
Posted Date
Jan 30, 2026
Due Date
Mar 5, 2026
Release: Jan 30, 2026
Close: Mar 5, 2026
Change 844 bridge ties on the dual track calumet river truss bridge.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
TDOT solicits CM/GC preconstruction services (with option to negotiate construction under a GMP) for the SR-1 Bridge Replacement over the North Fork Holston River (Hawkins & Sullivan Counties, TN). Key commercial points: preconstruction services estimate not to exceed $450,000; estimated construction cost ~$50,000,000; CM/GC must self-perform at least 30% of construction; surety letter showing bonding capacity ≥ $50,000,000 required; minimum insurance and TDOT prequalification required; mandatory pre-proposal meeting (failure to attend results in elimination); environmental clearance pending and construction proceeds only after GMP acceptance. Organizational conflict restrictions list several firms that cannot participate on proposer teams.
Posted Date
Dec 4, 2025
Due Date
Feb 6, 2026
Release: Dec 4, 2025
Close: Feb 6, 2026
TDOT solicits CM/GC preconstruction services (with option to negotiate construction under a GMP) for the SR-1 Bridge Replacement over the North Fork Holston River (Hawkins & Sullivan Counties, TN). Key commercial points: preconstruction services estimate not to exceed $450,000; estimated construction cost ~$50,000,000; CM/GC must self-perform at least 30% of construction; surety letter showing bonding capacity ≥ $50,000,000 required; minimum insurance and TDOT prequalification required; mandatory pre-proposal meeting (failure to attend results in elimination); environmental clearance pending and construction proceeds only after GMP acceptance. Organizational conflict restrictions list several firms that cannot participate on proposer teams.
AvailableThis RFP is for the replacement of Bridge No. 05068.
Posted Date
Jan 2, 2026
Due Date
Feb 4, 2026
Release: Jan 2, 2026
Close: Feb 4, 2026
This RFP is for the replacement of Bridge No. 05068.
AvailableRelease: Jan 30, 2026
Close: Feb 26, 2026
Work includes replacement of bridge.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →