Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procuring design and construction services for a new 1,441-foot-long, 55-foot-wide bridge along SR 25/US 17/SR 99/N. Walton Street at the Darien River in McIntosh County, Georgia.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Bridge design-build project.
Posted Date
Dec 17, 2025
Due Date
Dec 29, 2025
Release: Dec 17, 2025
Close: Dec 29, 2025
Bridge design-build project.
AvailablePedestrian bridge design, build, operate, and transfer project. See attached file.
Posted Date
Nov 25, 2025
Due Date
Dec 22, 2025
Release: Nov 25, 2025
Close: Dec 22, 2025
Pedestrian bridge design, build, operate, and transfer project. See attached file.
AvailableDESIGN-BUILD - Best value design-build project: reconstruction of i-94/i-69, m-25 connector, bridge interchange and ramps to accommodate the reconfiguration of the blue water bridge plaza including new bridge construction and bridge replacements, and the demolition and construction of buildings in the city. This project contains a 5 year warranty for new/reconstructed jointed plain concrete pavement, a 2 year bridge coating warranty and a 2 year warranty on concrete surface coating.
Posted Date
Jul 24, 2025
Due Date
Dec 19, 2025
Release: Jul 24, 2025
Close: Dec 19, 2025
DESIGN-BUILD - Best value design-build project: reconstruction of i-94/i-69, m-25 connector, bridge interchange and ramps to accommodate the reconfiguration of the blue water bridge plaza including new bridge construction and bridge replacements, and the demolition and construction of buildings in the city. This project contains a 5 year warranty for new/reconstructed jointed plain concrete pavement, a 2 year bridge coating warranty and a 2 year warranty on concrete surface coating.
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
Posted Date
Dec 2, 2024
Due Date
Jan 15, 2026
Release: Dec 2, 2024
Close: Jan 15, 2026
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis