Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Change 844 bridge ties on the dual track calumet river truss bridge.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide bridge over the calumet river rehabilitation.
Posted Date
Jan 15, 2026
Due Date
Feb 25, 2026
Release: Jan 15, 2026
Close: Feb 25, 2026
Provide bridge over the calumet river rehabilitation.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the replacement of Bridge No. 05068.
Posted Date
Jan 2, 2026
Due Date
Feb 4, 2026
Release: Jan 2, 2026
Close: Feb 4, 2026
This RFP is for the replacement of Bridge No. 05068.
AvailableThe Town of Ridgefield, Connecticut invites sealed bids for the replacement of Bridge No. 05510 on Portland Avenue over the Norwalk River (State Project No. 0117-0163; F.A.P. # 6117(006)). Bids are due on February 26, 2026 at 11:00 a.m. Eastern; a mandatory pre-bid meeting is scheduled for February 12, 2026 at 10:00 a.m. at the bridge site. Plans and specifications are available via Advanced Reprographics’ public planroom, and CTDOT prequalification and standard specifications apply.
Posted Date
Jan 30, 2026
Due Date
Feb 26, 2026
Release: Jan 30, 2026
Close: Feb 26, 2026
The Town of Ridgefield, Connecticut invites sealed bids for the replacement of Bridge No. 05510 on Portland Avenue over the Norwalk River (State Project No. 0117-0163; F.A.P. # 6117(006)). Bids are due on February 26, 2026 at 11:00 a.m. Eastern; a mandatory pre-bid meeting is scheduled for February 12, 2026 at 10:00 a.m. at the bridge site. Plans and specifications are available via Advanced Reprographics’ public planroom, and CTDOT prequalification and standard specifications apply.
AvailableDesign- Build: Provide design and construction of a new bridge approx 1,441' long, 55' wide offset 40' west of the existing alignment.
Posted Date
Dec 18, 2025
Due Date
Mar 26, 2026
Release: Dec 18, 2025
Close: Mar 26, 2026
Design- Build: Provide design and construction of a new bridge approx 1,441' long, 55' wide offset 40' west of the existing alignment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →