Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD: Provide design-build construction services for the expansion of the BOTA LPOE. This project is for the design and construction of a new port of entry to replace the existing port. The current Land Port of Entry (LPOE) is a full-service port that inspects privately owned and commercial vehicles and pedestrians. It is currently operating from outdated, deteriorating facilities that do not adequately meet the functional needs of the tenant. The new construction project will correct port deficiencies and modernize its facility to accommodate the increasing traffic. The current LPOE will be required to stay in continuous operation during the construction; the contractor will be required to phase the construction. At the start of construction, commercial traffic will be permanently redirected to nearby LPOEs. The project construction components include but not limited to construction of an administration building to include an expanded pedestrian inspection area; primary and secondary passenger vehicle inspection facilities; outside vehicle parking expansion; seized vehicle processing area; a kennel; canopies, outbound inspection for pedestrian and privately owned vehicles and buses, outbound support office building and new paving throughout the LPOE. The project will also include bus inspection facilities for the Federal Motor Carrier Safety Administration (FMCSA), including a canopy and building for FMCSA staff. This project is subject to Design Excellence and Construction Excellence Procedures. The design-build scope of work includes all management, supervision, labor, equipment and materials required to provide architectural, engineering, construction, and other related services necessary to design and construct the new facilities as well as demolish the existing facilities including abatement. Related services include, but are not limited to, site planning, utility relocation (as needed), testing and inspection during construction, commissioning, and potential additional analysis of the site.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The General Services Administration seeks a design-build contractor for the modernization and expansion of the Bridge of the Americas Land Port of Entry in El Paso, Texas. The project involves constructing new administration and inspection facilities, expanding parking, and performing site work while maintaining port operations through phased construction. This unrestricted procurement has an estimated cost range of $400 million to $460 million and a performance period of approximately 1,610 days.
Posted Date
Jan 26, 2026
Due Date
Mar 23, 2026
Release: Jan 26, 2026
Close: Mar 23, 2026
The General Services Administration seeks a design-build contractor for the modernization and expansion of the Bridge of the Americas Land Port of Entry in El Paso, Texas. The project involves constructing new administration and inspection facilities, expanding parking, and performing site work while maintaining port operations through phased construction. This unrestricted procurement has an estimated cost range of $400 million to $460 million and a performance period of approximately 1,610 days.
AvailableThe GSA Public Buildings Service is soliciting design-build construction services to modernize and replace the Bridge of the Americas Land Port of Entry in El Paso, Texas. The project uses a two-phase selection procedure with an estimated design and construction cost range between $400,000,000 and $460,000,000. Phase 1 qualifications are due by March 23, 2026, and a $240,000 stipend is offered to unsuccessful shortlisted firms that submit acceptable Phase 2 proposals.
Posted Date
Jan 26, 2026
Due Date
Mar 23, 2026
Release: Jan 26, 2026
Close: Mar 23, 2026
The GSA Public Buildings Service is soliciting design-build construction services to modernize and replace the Bridge of the Americas Land Port of Entry in El Paso, Texas. The project uses a two-phase selection procedure with an estimated design and construction cost range between $400,000,000 and $460,000,000. Phase 1 qualifications are due by March 23, 2026, and a $240,000 stipend is offered to unsuccessful shortlisted firms that submit acceptable Phase 2 proposals.
The General Services Administration issued a design-build solicitation to modernize and replace the Bridge of the Americas Land Port of Entry in El Paso, TX, including new inspection facilities and an administration building. The project requires phased construction to maintain continuous operations and follows GSA Design and Construction Excellence procedures with an estimated cost range of $400 million to $460 million. Primarily funded by the Infrastructure Investment and Jobs Act, the selection process uses a two-phase design-build procedure.
Posted Date
Jan 26, 2026
Due Date
Mar 23, 2026
Release: Jan 26, 2026
Close: Mar 23, 2026
The General Services Administration issued a design-build solicitation to modernize and replace the Bridge of the Americas Land Port of Entry in El Paso, TX, including new inspection facilities and an administration building. The project requires phased construction to maintain continuous operations and follows GSA Design and Construction Excellence procedures with an estimated cost range of $400 million to $460 million. Primarily funded by the Infrastructure Investment and Jobs Act, the selection process uses a two-phase design-build procedure.
DESIGN BUILD - Elevators Modernization.
Posted Date
Dec 11, 2025
Due Date
Feb 9, 2026
Release: Dec 11, 2025
Close: Feb 9, 2026
DESIGN BUILD - Elevators Modernization.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis