Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD of the sebald area entrance of elk creek metropark. 5,470 sy clearing and grubbing; 1,950 cy excavation; 5,143 sy seeding and mulching; 16,667 erosion control; 126 cy 1. 25" asphalt concrete surface course; 252 cy 2. 5" asphalt concrete intermediate course; 38 sf sign; 115' crosswalk line;
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN/BUILD project for design and construction services necessary to improve the intersection of road project.
Posted Date
Jul 11, 2025
Due Date
Jan 22, 2026
Release: Jul 11, 2025
Close: Jan 22, 2026
DESIGN/BUILD project for design and construction services necessary to improve the intersection of road project.
AvailableBridge design-build project.
Posted Date
Dec 17, 2025
Due Date
Dec 29, 2025
Release: Dec 17, 2025
Close: Dec 29, 2025
Bridge design-build project.
AvailableDESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
Posted Date
Dec 2, 2024
Due Date
Jan 15, 2026
Release: Dec 2, 2024
Close: Jan 15, 2026
DESIGN-BUILD: Project involves design-build services for the route 50 bridge over cedar swamp creek project.
AvailableTo provide professional design/build services to include professional design and engineering services for the preparation of construction documents, obtaining permits and construction of the Yard to be located at 389 Burns Crossing Road in Severn, MD to the south of the Millersville Landfill and Resource Recovery Facility.
Posted Date
Nov 25, 2025
Due Date
Jan 29, 2026
Release: Nov 25, 2025
Close: Jan 29, 2026
To provide professional design/build services to include professional design and engineering services for the preparation of construction documents, obtaining permits and construction of the Yard to be located at 389 Burns Crossing Road in Severn, MD to the south of the Millersville Landfill and Resource Recovery Facility.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →