Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Zionsville seeks proposals for designing, building, operating, and transferring Fire Station 295 through a public-private agreement. The project includes site development and construction of a new fire station with a maximum budget of $8 million. The station will feature apparatus bays, a kitchen, living and office spaces, and fitness areas. The RFPQ outlines responsibilities for design, permits, construction, and professional services, with a focus on private sector expertise to enhance efficiency and cost management.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Pedestrian bridge design, build, operate, and transfer project. See attached file.
Posted Date
Nov 25, 2025
Due Date
Dec 22, 2025
Release: Nov 25, 2025
Close: Dec 22, 2025
Pedestrian bridge design, build, operate, and transfer project. See attached file.
AvailableDesign-build: Work includes north transfer station canopy & floor design build.
Posted Date
Oct 28, 2025
Due Date
Dec 12, 2025
Release: Oct 28, 2025
Close: Dec 12, 2025
Design-build: Work includes north transfer station canopy & floor design build.
Design-build teams for the expansion and renovation to an existing one-story fire station.
Posted Date
Dec 6, 2025
Due Date
Dec 22, 2025
Release: Dec 6, 2025
Close: Dec 22, 2025
Design-build teams for the expansion and renovation to an existing one-story fire station.
AvailableDesign-build turnkey replacement of the failed VRF system with residential DX split HVAC systems for Bryan Fire Station No. 2, including full design, installation of ~35–40 tons capacity (multiple split systems), gas-fired furnaces, two DOAS units, new outdoor condensing units and refrigerant line sets, soft-start kits, upgraded media filters, remote monitoring, and related demolition/repairs. Equipment must be industry-standard/non‑proprietary (e.g., Carrier, Daikin, Mitsubishi), local-serviceable, code-compliant; work to accommodate an occupied 24/7 fire station. Estimated budget $600,000–$800,000.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Design-build turnkey replacement of the failed VRF system with residential DX split HVAC systems for Bryan Fire Station No. 2, including full design, installation of ~35–40 tons capacity (multiple split systems), gas-fired furnaces, two DOAS units, new outdoor condensing units and refrigerant line sets, soft-start kits, upgraded media filters, remote monitoring, and related demolition/repairs. Equipment must be industry-standard/non‑proprietary (e.g., Carrier, Daikin, Mitsubishi), local-serviceable, code-compliant; work to accommodate an occupied 24/7 fire station. Estimated budget $600,000–$800,000.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis