Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design-build turnkey replacement of the failed VRF system with residential DX split HVAC systems for Bryan Fire Station No. 2, including full design, installation of ~35–40 tons capacity (multiple split systems), gas-fired furnaces, two DOAS units, new outdoor condensing units and refrigerant line sets, soft-start kits, upgraded media filters, remote monitoring, and related demolition/repairs. Equipment must be industry-standard/non‑proprietary (e.g., Carrier, Daikin, Mitsubishi), local-serviceable, code-compliant; work to accommodate an occupied 24/7 fire station. Estimated budget $600,000–$800,000.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide design and build services for the replacement of existing HVAC system for city fire station no. 2.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Provide design and build services for the replacement of existing HVAC system for city fire station no. 2.
AvailableDesign-Bid-Build Provide labor and material to replace existing air handlers, HVAC duct, install new VAVs, install new ceiling and lighting, new fire alarm system, and HVAC control system
Posted Date
Nov 26, 2025
Due Date
Dec 16, 2025
Release: Nov 26, 2025
Close: Dec 16, 2025
Design-Bid-Build Provide labor and material to replace existing air handlers, HVAC duct, install new VAVs, install new ceiling and lighting, new fire alarm system, and HVAC control system
AvailableThe City of Fort Lauderdale issued an RFP to solicit proposals from firms qualified in Step One for the design, permitting, construction, testing, and startup of Fire Rescue Station No. 13 and Emergency Medical Station No. 88 in Fort Lauderdale per the Design Criteria Package prepared by H2M Architects and Engineers. The City may award both projects to a single Design-Build firm and reserves the right to negotiate scope and fees with the highest-ranked proposer.
Posted Date
Nov 21, 2025
Due Date
Jan 12, 2026
Release: Nov 21, 2025
Close: Jan 12, 2026
The City of Fort Lauderdale issued an RFP to solicit proposals from firms qualified in Step One for the design, permitting, construction, testing, and startup of Fire Rescue Station No. 13 and Emergency Medical Station No. 88 in Fort Lauderdale per the Design Criteria Package prepared by H2M Architects and Engineers. The City may award both projects to a single Design-Build firm and reserves the right to negotiate scope and fees with the highest-ranked proposer.
Design-build teams for the expansion and renovation to an existing one-story fire station.
Posted Date
Dec 6, 2025
Due Date
Dec 22, 2025
Release: Dec 6, 2025
Close: Dec 22, 2025
Design-build teams for the expansion and renovation to an existing one-story fire station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis