Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD: This is a design-build project to construct a new maintenance shop at airport.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Design-build of an 8000 sq. ft. single slope maintenance shop with three garage doors (two 20'W x 14'H, one 12'W x 14'H), including utility stub-ins, 8" concrete, R30 roofing, and R19 wall insulation, at Philip Billard Airport.
Posted Date
Dec 23, 2025
Due Date
Feb 3, 2026
Release: Dec 23, 2025
Close: Feb 3, 2026
Design-build of an 8000 sq. ft. single slope maintenance shop with three garage doors (two 20'W x 14'H, one 12'W x 14'H), including utility stub-ins, 8" concrete, R30 roofing, and R19 wall insulation, at Philip Billard Airport.
AvailableDESIGN-BUILD - old ag shop classroom renovations.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
DESIGN-BUILD - old ag shop classroom renovations.
AvailableDESIGN-BUILD and 20 year Maintenance program contract for the city's potable water storage tanks.
Posted Date
Dec 30, 2025
Due Date
Jan 30, 2026
Release: Dec 30, 2025
Close: Jan 30, 2026
DESIGN-BUILD and 20 year Maintenance program contract for the city's potable water storage tanks.
AvailableDESIGN-BUILD services for site evaluation, design, installation, operation and maintenance of the solar for all program.
Posted Date
Dec 5, 2025
Due Date
Jan 26, 2026
Release: Dec 5, 2025
Close: Jan 26, 2026
DESIGN-BUILD services for site evaluation, design, installation, operation and maintenance of the solar for all program.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis