Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN -BUILD - KSU Greenhouse NSF Grant Frankfort.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
DESIGN-BUILD. Repairs to cooling, reverse osmosis and misting systems, design and installation of rainwater collection and lighting systems, completion of restroom in staff office facility, electrical and plumbing, and design and construction of storage sheds and greenhouses.
Posted Date
Dec 3, 2025
Due Date
Dec 31, 2025
Release: Dec 3, 2025
Close: Dec 31, 2025
DESIGN-BUILD. Repairs to cooling, reverse osmosis and misting systems, design and installation of rainwater collection and lighting systems, completion of restroom in staff office facility, electrical and plumbing, and design and construction of storage sheds and greenhouses.
Premium
Access the largest public sector contact database
DESIGN-BUILD: design and construction of a new cafeteria/kitchen and a new or remodeled gymnasium.
Posted Date
Oct 22, 2025
Due Date
Dec 16, 2025
Release: Oct 22, 2025
Close: Dec 16, 2025
DESIGN-BUILD: design and construction of a new cafeteria/kitchen and a new or remodeled gymnasium.
AvailableDESIGN-BUILD: The Project Scope includes Additions and Renovations to the existing Bridgeton High School to provide additional capacity to educate 326 students.
Posted Date
May 20, 2025
Due Date
Jan 21, 2026
Release: May 20, 2025
Close: Jan 21, 2026
DESIGN-BUILD: The Project Scope includes Additions and Renovations to the existing Bridgeton High School to provide additional capacity to educate 326 students.
AvailableThe purpose of the hall renovation is to re-construct deteriorated existing masonry parapet crenellations and to conduct minor roof repair and a limited area of roof replacement. The project scope includes removal of the existing crenelations, inspection and repair of existing sheet metal flashings, construction of new crenelations with new brick to match the existing historic brick, and installation of new sheet metal flashings. The scope of roof repair includes inspection of existing modified bitumen roofing membranes for damage and repair of damaged roof membranes. Limited area roof replacement at the tower includes removal of existing roofing and saturated insulation, and installation of new modified bitumen roofing and insulation to match the existing insulation thickness to coordinate with existing flashing and scuppers. Existing lightening protection will need to be removed and re-installed in order to perform the scope of masonry and flashing work.
Posted Date
Nov 12, 2025
Due Date
Dec 22, 2025
Release: Nov 12, 2025
Close: Dec 22, 2025
The purpose of the hall renovation is to re-construct deteriorated existing masonry parapet crenellations and to conduct minor roof repair and a limited area of roof replacement. The project scope includes removal of the existing crenelations, inspection and repair of existing sheet metal flashings, construction of new crenelations with new brick to match the existing historic brick, and installation of new sheet metal flashings. The scope of roof repair includes inspection of existing modified bitumen roofing membranes for damage and repair of damaged roof membranes. Limited area roof replacement at the tower includes removal of existing roofing and saturated insulation, and installation of new modified bitumen roofing and insulation to match the existing insulation thickness to coordinate with existing flashing and scuppers. Existing lightening protection will need to be removed and re-installed in order to perform the scope of masonry and flashing work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis