Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of demolishing an abandoned water tower and the associated underground water piping back to the existing valve and capping. New life safety infrastructure will need to be installed for the Main Building Kitchen and Dining Area to provide adequate water pressure for the sprinkler system. The project will also consist of installing a new campus generator to the electrical infrastructure to provide adequate emergency power to the dormitories, kitchen, and central utility plant. The project will also consist of multiple roof replacements based on a roofing study that was completed in December 2022.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Design-build: work consists of demolishing an abandoned water tower and the associated underground water piping back to the existing valve and capping, new life safety infrastructure will need to be installed for the main building kitchen and dining area to provide adequate water pressure for the sprinkler system, the project will also consist of installing a new campus generator to the electrical infrastructure to provide adequate emergency power to the dormitories, kitchen, and central utility plant, the project will also consist of multiple roof replacements.
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Close: Jan 6, 2026
Design-build: work consists of demolishing an abandoned water tower and the associated underground water piping back to the existing valve and capping, new life safety infrastructure will need to be installed for the main building kitchen and dining area to provide adequate water pressure for the sprinkler system, the project will also consist of installing a new campus generator to the electrical infrastructure to provide adequate emergency power to the dormitories, kitchen, and central utility plant, the project will also consist of multiple roof replacements.
AvailableDESIGN-BUILD services for design and construct the DPW Campus. The Project consists of designing and constructing an operations facility for the Department of Public Works (“DPW”). This facility will house approximately 18 employees, as well as the equipment, vehicles, and supplies primarily of the Streets and Stormwater Divisions of the DPW, all of which are currently housed at the Municipal Services Building. The Project will include the following components: (i) Office Building (+/- 5300 SF); (ii) Heated vehicle garage (+/- 30,000 SF); (iii) Cold storage barn (+/- 10,000 SF); (iv) Salt storage barn (+/-6000 SF); (v) Outdoor bulk material storage; and (vi) Outdoor equipment storage. See attached files.
Posted Date
Nov 18, 2025
Due Date
Dec 12, 2025
Release: Nov 18, 2025
Close: Dec 12, 2025
DESIGN-BUILD services for design and construct the DPW Campus. The Project consists of designing and constructing an operations facility for the Department of Public Works (“DPW”). This facility will house approximately 18 employees, as well as the equipment, vehicles, and supplies primarily of the Streets and Stormwater Divisions of the DPW, all of which are currently housed at the Municipal Services Building. The Project will include the following components: (i) Office Building (+/- 5300 SF); (ii) Heated vehicle garage (+/- 30,000 SF); (iii) Cold storage barn (+/- 10,000 SF); (iv) Salt storage barn (+/-6000 SF); (v) Outdoor bulk material storage; and (vi) Outdoor equipment storage. See attached files.
DESIGN-BUILD services for design and construct the DPW Campus. The Project consists of designing and constructing an operations facility for the Department of Public Works (“DPW”). This facility will house approximately 18 employees, as well as the equipment, vehicles, and supplies primarily of the Streets and Stormwater Divisions of the DPW, all of which are currently housed at the Municipal Services Building. The Project will include the following components: (i) Office Building (+/- 5300 SF); (ii) Heated vehicle garage (+/- 30,000 SF); (iii) Cold storage barn (+/- 10,000 SF); (iv) Salt storage barn (+/-6000 SF); (v) Outdoor bulk material storage; and (vi) Outdoor equipment storage. See attached files.
Posted Date
Nov 18, 2025
Due Date
Dec 12, 2025
Release: Nov 18, 2025
Close: Dec 12, 2025
DESIGN-BUILD services for design and construct the DPW Campus. The Project consists of designing and constructing an operations facility for the Department of Public Works (“DPW”). This facility will house approximately 18 employees, as well as the equipment, vehicles, and supplies primarily of the Streets and Stormwater Divisions of the DPW, all of which are currently housed at the Municipal Services Building. The Project will include the following components: (i) Office Building (+/- 5300 SF); (ii) Heated vehicle garage (+/- 30,000 SF); (iii) Cold storage barn (+/- 10,000 SF); (iv) Salt storage barn (+/-6000 SF); (v) Outdoor bulk material storage; and (vi) Outdoor equipment storage. See attached files.
Pedestrian bridge design, build, operate, and transfer project. See attached file.
Posted Date
Nov 25, 2025
Due Date
Dec 22, 2025
Release: Nov 25, 2025
Close: Dec 22, 2025
Pedestrian bridge design, build, operate, and transfer project. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis