Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Karuk Tribe of California
Proposals for the design and installation of a playground that caters to children of various ages and supports outdoor play and recreation. This project aims to create a safe, engaging, and accessible recreational area for children and families and shall be installed. The playground will be part of a future housing development that will initially include eight (8) homes and have an additional four (4) homes in the future.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of South Portland
Design and installation of a new playground.
Posted Date
Nov 4, 2025
Due Date
Dec 11, 2025
Release: Nov 4, 2025
City of South Portland
Close: Dec 11, 2025
Design and installation of a new playground.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of South Portland
The City of South Portland, Maine, is requesting bid proposals from qualified playground equipment vendors for the design and installation of a new playground in our Pleasantdale neighborhood located at 33 Elm St, South Portland. Proposals will be received electronically by email to: bids@southportland.gov until 2:00 PM, Thursday, December 11, 2025, at which time they will be publicly opened.
Posted Date
Nov 3, 2025
Due Date
Dec 10, 2025
Release: Nov 3, 2025
City of South Portland
Close: Dec 10, 2025
The City of South Portland, Maine, is requesting bid proposals from qualified playground equipment vendors for the design and installation of a new playground in our Pleasantdale neighborhood located at 33 Elm St, South Portland. Proposals will be received electronically by email to: bids@southportland.gov until 2:00 PM, Thursday, December 11, 2025, at which time they will be publicly opened.
AvailableCity of Gardner
Design-Build. Seeking qualified and experienced design-build contractors for the design and construction of a new park playground. The project will include the design, supply, and installation of playground equipment, turf safety surfacing, and associated site work such as trail/sidewalk repair and minor grading as needed.
Posted Date
Nov 18, 2025
Due Date
Dec 9, 2025
Release: Nov 18, 2025
City of Gardner
Close: Dec 9, 2025
Design-Build. Seeking qualified and experienced design-build contractors for the design and construction of a new park playground. The project will include the design, supply, and installation of playground equipment, turf safety surfacing, and associated site work such as trail/sidewalk repair and minor grading as needed.
AvailableLimestone County School District
Demolish of existing equipment and installation of new Kompan playground equipment.
Posted Date
Nov 19, 2025
Due Date
Dec 12, 2025
Release: Nov 19, 2025
Limestone County School District
Close: Dec 12, 2025
Demolish of existing equipment and installation of new Kompan playground equipment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →