Summary
The National Air Security Operations Center (NASOC) San Angelo MU-2 Hanga is being renovated as an independent Design/Build (DB) construction contract. To support additional UAS aircraft being based at this location, the existing UAS hangar requires interior improvements by renovating hangar spaces for administrative areas, HVAC upgrades, UPS systems, eight UAS CGCS rooms, locker rooms with showers, a fitness room, fire suppression, M/E systems, integrated security, raised floors, armory renovation, and installation of a 10-ton gantry crane. Existing temporary facilities may require decommissioning and will be negotiated later. Additional UAS are scheduled for delivery Q3 FY28; therefore, it is essential to renovate the hangar to create ground control station rooms prior to Q3 FY28.