Summary
The work for the Waterline Upgrade includes installation of new 8" and 12" waterlines totaling 1,633 LF in 26th Street East and Berry Lane East. There will be three points of connection. Two connections will be made in David Court East and one connection will be made within the public easement located immediately west of the terminus of 26th Street East. Three new fire hydrants will be installed, and seventeen residential water services will need to be reconnected. The existing 6" asbestos water main will be abandoned in place except where it conflicts with new improvements. The work for the Storm Drainage Upgrade includes the installation of 177 LF of 8" diameter ductile iron storm sewer pipe, 440 LF of 12" diameter ductile iron storm sewer pipe, fourteen Type 1 catch basins, a stormwater treatment vault, and roadside swales. These upgrades will be in the right-of-way of the following roads: Berry Lane East, David Court East and 27th Street East. The work for the Paving Upgrade includes a combination of full depth Hot Mix Asphalt pavement and base replacement, and a 2" Hot Mix Asphalt Overlay. The project will utilize approx. 1,450 tons of Hot Mix Asphalt, and approx. 1,140 tons of Crushed Surfacing Base Course. 3,700 SY of existing bituminous pavement will be removed. These upgrades will be in the right-of-way of the following roads: Berry Lane East, David Court East, 26th Street East, and 27th Street East.