Work includes clearing and grubbing canal maintenance berm; removing a vehicular guard rail, providing temporary vehicular protection and re-installing a vehicular guard rail; installation of a 5' dia contech inline cds2020-5-c drainage treatment manhole into an existing 18 rcp drainage system; installation of two flumes along the high school ditch; stabilizing approx 780 LF on both sides of the high school ditch with filter fabric underlayment and 6-12 rip-rap (armor); removal of vegetation, restoring the maintenance berms, repairing any fencing, and restoring the daniels way row; and any other improvements damaged during the vegetation removal, water quality improvement installations and/or ditch bank stabilization process.