Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Gaston County
Force main. Installation of approximately 8,200 feet of new force main, base bid as 10 inch with an alternate as 12 inch. Includes one directional bore, approximately 700 feet.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Porter County
Force main relocation. The work included shall be the installation of new 6" HDPE force main by horizontal directional boring installation with angled fittings and thrust blocks and anchors. Installation of the new force main will require removal and replacement of a light pole and electrical box, a 12" PVC culvert, asphalt, and the subgrade preparation requisite with such items. The new force main shall be connected to the old force main and the disconnected section of old force main shall be drained, filled with grout, and capped for abandonment. The project will also include demolition and removal of the existing structure, and installation of the proposed structure.
Posted Date
Nov 19, 2025
Due Date
Dec 9, 2025
Release: Nov 19, 2025
Porter County
Close: Dec 9, 2025
Force main relocation. The work included shall be the installation of new 6" HDPE force main by horizontal directional boring installation with angled fittings and thrust blocks and anchors. Installation of the new force main will require removal and replacement of a light pole and electrical box, a 12" PVC culvert, asphalt, and the subgrade preparation requisite with such items. The new force main shall be connected to the old force main and the disconnected section of old force main shall be drained, filled with grout, and capped for abandonment. The project will also include demolition and removal of the existing structure, and installation of the proposed structure.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
London Utility Commission
Installation of approx. 7,600 LF of 12" PVC force main, 500 LF of 12" HDPE force main, three (3) air release valves, and other associated appurtenances.
Posted Date
-
Due Date
Nov 25, 2025
Release: -
London Utility Commission
Close: Nov 25, 2025
Installation of approx. 7,600 LF of 12" PVC force main, 500 LF of 12" HDPE force main, three (3) air release valves, and other associated appurtenances.
Lee County
SE force main improvements
Posted Date
Oct 31, 2025
Due Date
Dec 2, 2025
Release: Oct 31, 2025
Lee County
Close: Dec 2, 2025
SE force main improvements
AvailableMilwaukee Metropolitan Sewerage District
The project consists of the cleaning, closed circuit television video (CCTV) inspection, and rehabilitation of a force main at the owner's jones island water reclamation facility (JIWRF). the force main carries flow from the head tank at the inline pump station (IPS) to either preliminary treatment or directly to disinfection and consists of approx. 801 LF of 72" reinforced concrete pressure pipe (RCPP), 177 LF of 72/78" steel pipe, a 72-" butterfly valve, and 222 LF of 78" rcpp for a total length of approx. 1,200 LF. Before rehabilitation work can be conducted, the force main needs to be cleaned and undergo a CCTV inspection. The RCPP segments require spot repair at a total of five locations. These spot repairs require surface preparation, abrasive or centrifugal wheel blasting, repair using repair mortar, and recoating with a high-build epoxy-based liner. The steel pipe segment and butterfly valve are to be cleaned and prepared for coating, in their entirety, with abrasive or centrifugal wheel blasting and recoated with a high-build epoxy-based liner. The contractor will supply all equipment and major power needed for the work.
Posted Date
Nov 19, 2025
Due Date
Jan 14, 2026
Release: Nov 19, 2025
Milwaukee Metropolitan Sewerage District
Close: Jan 14, 2026
The project consists of the cleaning, closed circuit television video (CCTV) inspection, and rehabilitation of a force main at the owner's jones island water reclamation facility (JIWRF). the force main carries flow from the head tank at the inline pump station (IPS) to either preliminary treatment or directly to disinfection and consists of approx. 801 LF of 72" reinforced concrete pressure pipe (RCPP), 177 LF of 72/78" steel pipe, a 72-" butterfly valve, and 222 LF of 78" rcpp for a total length of approx. 1,200 LF. Before rehabilitation work can be conducted, the force main needs to be cleaned and undergo a CCTV inspection. The RCPP segments require spot repair at a total of five locations. These spot repairs require surface preparation, abrasive or centrifugal wheel blasting, repair using repair mortar, and recoating with a high-build epoxy-based liner. The steel pipe segment and butterfly valve are to be cleaned and prepared for coating, in their entirety, with abrasive or centrifugal wheel blasting and recoated with a high-build epoxy-based liner. The contractor will supply all equipment and major power needed for the work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →