Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provision of substation maintenance and testing services: electrical testing of two bus‑tie transformers and associated tap changers/regulators, plus insulation and bushing inspections of all covered substation equipment at CWEP Power Plant (300 S. River St., Carthage, MO). Project must be completed by April 30, 2026; pre‑proposal site tour scheduled.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project will consist of: a maintenance cycle on the power transformer and load tap changer at substation. All relay settings and schemes will be tested and verified along with proper operation and timing of the associated circuit breakers. The standby substation service battery.
Posted Date
Nov 20, 2025
Due Date
Dec 22, 2025
Release: Nov 20, 2025
Close: Dec 22, 2025
Project will consist of: a maintenance cycle on the power transformer and load tap changer at substation. All relay settings and schemes will be tested and verified along with proper operation and timing of the associated circuit breakers. The standby substation service battery.
Premium
Access the largest public sector contact database
Substation panels for the central city substation.
Posted Date
Dec 2, 2025
Due Date
Dec 31, 2025
Release: Dec 2, 2025
Close: Dec 31, 2025
Substation panels for the central city substation.
AvailableThe City of Geneva seeks proposals for preventive maintenance at Peyton Substation, including maintenance of the Power Transformer, Load Tap Changer, and Station Standby Service Battery. The project involves testing and verifying relay settings and circuit breaker operations, with a requirement for qualified personnel experienced in high voltage work. A bid bond and compliance with prevailing wage rates are required.
Posted Date
Nov 20, 2025
Due Date
Dec 22, 2025
Release: Nov 20, 2025
Close: Dec 22, 2025
The City of Geneva seeks proposals for preventive maintenance at Peyton Substation, including maintenance of the Power Transformer, Load Tap Changer, and Station Standby Service Battery. The project involves testing and verifying relay settings and circuit breaker operations, with a requirement for qualified personnel experienced in high voltage work. A bid bond and compliance with prevailing wage rates are required.
AvailableWork includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
Posted Date
Nov 22, 2025
Due Date
Jan 8, 2026
Release: Nov 22, 2025
Close: Jan 8, 2026
Work includes design, manufacture, testing, and delivery of the substation expansion - substation steel and equipment. The work for which bids are to be received consists of: design of substation steel structures, structure foundations, and substation ground grid. Providing all materials for the substation structures and ground grid. Providing all station insulators, switches, and bus work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis