The work shall consist of, but not limited to, sidewalk, curb and gutter, pcc curb only, and driveway approaches, including root pruning and clear and grub of tree roots for concrete reconstruction.
Michigan Department of Technology, Management and Budget
Work includes 0. 30 mi of concrete sidewalk and ramps, concrete curb and gutter, pedestrian refuge, hot mix asphalt hand patching, and permanent pavement markings that also includes 9 EA culv, rem, less than 24 inch; 610 LF curb and gutter, rem; 282 SY pavt, rem; 53 SY sidewalk, rem; 1,150 CY excavation, earth; 500 LF erosion control, silt fence; 250 LF sewer, cl a, perforated slcpp w\sock, 12 inch, tr det b, modifed. See attached file.
City of Duarte
This project requires the awarded contractor to construct new ADA ramps. The work includes removal and disposal of existing architectural barriers including but not limited the removal of concrete sidewalks, curb and gutter, existing non-compliant ramp if applicable, and adjusting to grade or relocation of utility vaults and signposts. It also includes minor grading of area where needed to accommodate the installation of a new PCC ADA compliant ramp done in accordance with the requirements of the Standard Specifications for Public Works Construction.
Michigan Department of Technology, Management and Budget
0.25 mi of hot mix asphalt reconstruction, concrete curb. Gutter and sidewalk and pavement markings.