Summary
Replacement of elevated apparatus bay floor (structural steel/concrete). The project consists of the replacement of the elevated concrete slab-on-deck. The project includes, but is not limited to, demolition and removal of the existing elevated concrete slab-on-deck in the 1950s apparatus bay, demolition and removal of the existing support framing and foundations, and installation of a new cast-in-place elevated concrete deck and support framing. Existing mechanical, electrical, and plumbing utilities located within space are to be protected and reused or replaced in-kind where reuse is not feasible. All work must be completed on or before March 31, 2027.