Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes site work, asphalt and concrete paving, concrete ramp, extending power, data and fire alarm, addition of an ADA stall to the Boys restroom.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide new stadium bleachers and press box project and new lunch structure addition.
Posted Date
Jan 10, 2026
Due Date
Jan 27, 2026
Release: Jan 10, 2026
Close: Jan 27, 2026
Provide new stadium bleachers and press box project and new lunch structure addition.
AvailableModifications to an existing press box structure at free state high school. Work of the project is defined by the contract documents and consists of the following: 1) The project entails modifying existing press box to include a new roof structure, new veneer, and enclose the existing ADA lift. 2) Any adjacent areas damaged during construction, regardless of the cause, must be repaired or replaced to the satisfaction of the Design Team Representative and the Owner’s Representative at no additional cost to the Project. 3) The building will not be occupied during construction, although the adjacent athletic fields may be utilized.
Posted Date
Jan 19, 2026
Due Date
Feb 5, 2026
Release: Jan 19, 2026
Close: Feb 5, 2026
Modifications to an existing press box structure at free state high school. Work of the project is defined by the contract documents and consists of the following: 1) The project entails modifying existing press box to include a new roof structure, new veneer, and enclose the existing ADA lift. 2) Any adjacent areas damaged during construction, regardless of the cause, must be repaired or replaced to the satisfaction of the Design Team Representative and the Owner’s Representative at no additional cost to the Project. 3) The building will not be occupied during construction, although the adjacent athletic fields may be utilized.
AvailableThe City of Ashland (OR) is soliciting qualifications-based proposals for professional engineering services (Project #2018-20) to provide ITB preparation support and project management for a new 7 million gallon per day water treatment plant. The contract is in two phases: Phase 1 focuses on ITB preparation, constructability review, and clarifying drawings/specs; Phase 2 covers project management during construction and commissioning. Funding sources noted include federal Safe Drinking Water Revolving Loan Funds and local/private partnerships; the solicitation was posted 2026-01-14 with proposals due 2026-02-12.
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Close: Feb 12, 2026
The City of Ashland (OR) is soliciting qualifications-based proposals for professional engineering services (Project #2018-20) to provide ITB preparation support and project management for a new 7 million gallon per day water treatment plant. The contract is in two phases: Phase 1 focuses on ITB preparation, constructability review, and clarifying drawings/specs; Phase 2 covers project management during construction and commissioning. Funding sources noted include federal Safe Drinking Water Revolving Loan Funds and local/private partnerships; the solicitation was posted 2026-01-14 with proposals due 2026-02-12.
AvailableWork includes softball field press box replacement, installation of 2-story prefabricated free standing press box.
Posted Date
Jan 1, 2026
Due Date
Jan 26, 2026
Release: Jan 1, 2026
Close: Jan 26, 2026
Work includes softball field press box replacement, installation of 2-story prefabricated free standing press box.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →