Summary
The University of Houston is soliciting sealed proposals for the full roof replacement of the Cullen Performance Hall auditorium. The scope of work includes providing all labor, equipment, materials, and supplies to replace the low-sloped built-up roofing and waterproofing over the main roof of the auditorium and the two lower side roofs above the service entrances, in accordance with drawings and specifications prepared by Zeigler Cooper Architects. A mandatory pre-proposal conference and site visit is scheduled for July 2, 2026 at 10:30 AM CT at the Cullen Performance Hall, Room 160, with responses due to the JAGGAER Sourcing Event Portal by 4:00 PM CDT on July 17, 2026.