Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking a design team to produce construction documents detailing replacement of existing light fixtures in multiple campus buildings with new led fixtures as well as installation of n light lighting control systems in each building to allow for long term energy savings. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Guaranteed energy savings contract.
Posted Date
Jan 20, 2026
Due Date
Feb 6, 2026
Release: Jan 20, 2026
Close: Feb 6, 2026
Guaranteed energy savings contract.
AvailableProvide construction manager at risk service. The project includes improvements to lighting, pedestrian and bicycle infrastructure, security systems, and traffic management in high-activity areas.
Posted Date
Dec 22, 2025
Due Date
Jan 28, 2026
Release: Dec 22, 2025
Close: Jan 28, 2026
Provide construction manager at risk service. The project includes improvements to lighting, pedestrian and bicycle infrastructure, security systems, and traffic management in high-activity areas.
AvailableProject involves the upgrade of security cameras and infrastructure project multiple campuses.
Posted Date
Jan 22, 2026
Due Date
Feb 20, 2026
Release: Jan 22, 2026
Close: Feb 20, 2026
Project involves the upgrade of security cameras and infrastructure project multiple campuses.
AvailableWork includes heavy civil work for the tunnel and within a-yard. Work will be executed on 10th avenue from street level and within a-yard at track level. Principal elements of the work include: construction of a cut-and-cover tunnel under 10th avenue, connecting the existing hudson yards concrete casing section 1 ("hycc-1") with a-yard, approx. 100' long. Underpinning the existing 450 west 33rd street overbuild structure and the relocation of its structural columns and the ps-5 structure to accommodate the future track alignment. Construction of the a-yard fan plant structural framing. See attached file.
Posted Date
Jan 21, 2026
Due Date
Mar 13, 2026
Release: Jan 21, 2026
Close: Mar 13, 2026
Work includes heavy civil work for the tunnel and within a-yard. Work will be executed on 10th avenue from street level and within a-yard at track level. Principal elements of the work include: construction of a cut-and-cover tunnel under 10th avenue, connecting the existing hudson yards concrete casing section 1 ("hycc-1") with a-yard, approx. 100' long. Underpinning the existing 450 west 33rd street overbuild structure and the relocation of its structural columns and the ps-5 structure to accommodate the future track alignment. Construction of the a-yard fan plant structural framing. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis