Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project generally consists of upgrades to the pump station including new pumps, electrical equipment, piping gallery, flow meter, new mechanical bar screen, the installation of approximately 120 LF of 24” PVC Gravity Sewer, 15,372 LF of 18” PVC Force main and 6,952 LF of 20” PVC force main.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the construction of improvements and upgrades to the Elswick Street Pump Station and Route 6 Pump Station, involving the removal and disposal of existing equipment, abandonment of a wet well, and the installation of new submersible pumps, a wet well, a valve vault, piping, valves, an electric generator, and associated electrical and instrumentation work.
Posted Date
Nov 26, 2025
Due Date
Jan 15, 2026
Release: Nov 26, 2025
Close: Jan 15, 2026
This RFP is for the construction of improvements and upgrades to the Elswick Street Pump Station and Route 6 Pump Station, involving the removal and disposal of existing equipment, abandonment of a wet well, and the installation of new submersible pumps, a wet well, a valve vault, piping, valves, an electric generator, and associated electrical and instrumentation work.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Equipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
Equipment covered by this bid includes the manufacture, delivery and start-up services for the Poquito Pump Station Replacement - Pump Station and Controls (Equipment Only).
AvailableReplacement of an existing raw sewage pump station.
Posted Date
Nov 11, 2025
Due Date
Jan 6, 2026
Release: Nov 11, 2025
Close: Jan 6, 2026
Replacement of an existing raw sewage pump station.
AvailableRemoval and disposal of two suction lift pumps, one back-up gas engine, pump controls, piping and valves in the pump station and wet well, various electrical equipment, 500-gallon LP gas aboveground storage tank and related appurtenances. Abandonment of wet well and various repairs to the pump station aboveground building. Furnish and installation of new submersible pumps, wet well, valve vault, piping and valves, electric generator, electrical and instrumentation work.
Posted Date
Jun 18, 2025
Due Date
Jan 15, 2026
Release: Jun 18, 2025
Close: Jan 15, 2026
Removal and disposal of two suction lift pumps, one back-up gas engine, pump controls, piping and valves in the pump station and wet well, various electrical equipment, 500-gallon LP gas aboveground storage tank and related appurtenances. Abandonment of wet well and various repairs to the pump station aboveground building. Furnish and installation of new submersible pumps, wet well, valve vault, piping and valves, electric generator, electrical and instrumentation work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →