Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Demolition of an existing bridge and the construction of a new 62-FT single span prestressed concrete box beam bridge. Guardrail and riprap will be installed along with any other incidental work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes the full replacement of bridge and all related work.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
The project includes the full replacement of bridge and all related work.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes bridge replacement.
Posted Date
Jan 17, 2026
Due Date
Feb 17, 2026
Release: Jan 17, 2026
Close: Feb 17, 2026
Work includes bridge replacement.
AvailableReplacement of existing Bridge No. 0360032 with a new 50' long x 24.5' wide single-span structure.
Posted Date
-
Due Date
Feb 9, 2026
Close: Feb 9, 2026
Replacement of existing Bridge No. 0360032 with a new 50' long x 24.5' wide single-span structure.
AvailableDemolition of existing bridge and construction of a new 54' composite wide flange steel beam bridge, including approach roadway work and incidental work.
Posted Date
-
Due Date
Feb 3, 2026
Release: -
Close: Feb 3, 2026
Demolition of existing bridge and construction of a new 54' composite wide flange steel beam bridge, including approach roadway work and incidental work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →